<startfeed />
 
<startfeed />
===== RIE 5 is up=====
+
=====MA6 TSA is down - Update=====
  +
Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something.
RIE 5 is up except for processes that use SiCl4.
 
   
//[[User:Mehalana v|Vraj Mehalana]] 09:39, 30 January 2024 (PST)
+
//[[User:Mehalana v|Vraj Mehalana]] 11:15, 1 May 2024 (PDT)
  +
=====Velion FIB Tool DOWN=====
=====Dry Etch, Si Deep RIE (PlasmaTherm DSEIII) - DSE Update=====
 
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
We have disassembled the entire chamber lid assembly. I have put an order in for all the necessary replacement parts and am waiting to hear back on the lead time for a couple of the items. I should have an update tomorrow.
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
Thanks,
 
   
  +
=====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10=====
-Aidan
 
  +
We are postponing the Maintenance date to May 6th – 10th.
  +
On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
   
//[[User:Mehalana v|Vraj Mehalana]] 09:39, 30 January 2024 (PST)
+
//[[User:Mehalana v|Vraj Mehalana]] 09:42, 5 April 2024 (PDT)
   
=====ICP #1 is down=====
+
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
The tool remains down. We did not find any "smoking gun" with the PC but did find that the PC's power supply had a non functional fan and the power supply did not test as good (granted it would still power up the PC). We will continue troubleshooting the PC issue in the morning.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
 
-Lee
 
 
//[[User:Mehalana v|Vraj Mehalana]] 09:39, 30 January 2024 (PST)
 
=====EBeam3 Planned Maintenance 2/7/24 - 2/8/24=====
 
EBeam3 is scheduled to be down starting at 8:00am on 2/7/24 through 4:00pm on 2/8//24 so that we can install the new transfer arm.
 
 
Please plan accordingly.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 09:28, 26 January 2024 (PST)
 
=====Oxford Cobra: Software bugs=====
 
The latest revision of software has several bugs: see email for details. We are working with Oxford to resolve via software upgrade.
 
// [[User:John_d|Demis D. John]] 10:08, 17 January 2024 (PST)
 
 
=====ASML Maintenance: Jan 29th-31st=====
 
The ASML will be down for periodic preventative maintenance on Jan 29th-Jan31st, please plan your process accordingly.
 
// [[User:John_d|Demis D. John]] 17:00, 11 January 2024 (PST)
 
 
=====Gowning Refresh: Jan 23rd=====
 
Beginning Tuesday January 23rd, we will be pulling gowns and booties for refresh. Please remove all personal items from your suits prior to the week your section will be cleared.
 
// [[User:John_d|Demis D. John]] 07:28, 11 January 2024 (PST)
 
 
=====EBeam#1: UP=====
 
EBeam1 is UP.
 
// [[User:John_d|Demis D. John]] 10:07, 17 January 2024 (PST)
 
 
=====DUV Flood: UP with new procedure=====
 
The new parts have been installed and the tool has been tested.
 
 
We have added a timer that interlocks the lamp power supply since some users seem to have a problem remembering to turn the tool off when finished with it. The minimum time it can be set for is 30 minutes and the max is 4 hours. You will no longer be operating the main breaker on the front of the power supply. I have updated the SOP to reflect the changes, there is a copy at the tool and on [https://wiki.nanofab.ucsb.edu/wiki/DUV_Flood_Expose#Documentation:~:text=Exposure%20System%20Spectra-,Documentation,-%5Bedit%20%7C its Wiki page].
 
 
// [[User:John_d|Demis D. John]] 17:18, 4 January 2024 (PST)
 
 
=====Job Opening: Process Engineer=====
 
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
 
 
//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)
 
   
 
=====Lab Access Changes: Symmetry App=====
 
=====Lab Access Changes: Symmetry App=====
 
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
   

Revision as of 11:15, 1 May 2024

MA6 TSA is down - Update

Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something.

//Vraj Mehalana 11:15, 1 May 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10

We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.

//Vraj Mehalana 09:42, 5 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)