Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
 
(635 intermediate revisions by 7 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
  +
=====Atomic Force Microscope (Dimension ICON) - 05/08: AFM Head needs repair=====
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
  +
I will have to take the AFM head unit back to Bruker for repair. The height sensor failed all the tests I tried so the Z-piezo/strain gauge unit will most likely need to be replaced. SO for the foreseeable future, the AFM is down.--Demis
<!-- Description of the RSS feed -->
 
''Equipment Status''
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
 
-->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 13:42, 9 May 2024 (PDT)
===== Suss Bonder =====
 
  +
=====MA6 TSA is down - Update=====
Suss fieldservice found several issues with the system. Suss will evaluate the issues and recommend possible solutions.
 
  +
Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something.
[[User:Silva|Silva]] 21:36, 13 February 2019 (PST)
 
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 11:15, 1 May 2024 (PDT)
===== KLA Tencor Surfscan =====
 
  +
=====Velion FIB Tool DOWN=====
The system is down. The vendor has located a replacement PCB. Once the board is secured, the vendor will schedule a visit and finish the system repairs.
 
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
[[User:Silva|Silva]] 21:51, 11 February 2019 (PST)
 
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
===== ALD Metal Dep =====
 
The replacement turbo pump has arrived. We will finish the turbo installation Thursday February 14th.
 
[[User:Silva|Silva]] 21:38, 13 February 2019 (PST)
 
   
===== E-Beam#1 =====
+
=====ASML optics replacement May 20th-22nd=====
  +
We will be performing beam delivery optics replacement on Mon May 20th to 22nd, to resolve a low intensity reading. The tool will be unavailable during this time.e.
The system is down. The E-Beam#1 power supply and control upgrade started today. We hope to complete the process within 10 business days. We will keep you posted as progress is made.
 
[[User:Silva|Silva]] 21:45, 11 February 2019 (PST)
 
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 09:40, 9 May 2024 (PDT)
===== Vapor HF Etch =====
 
The system is down. The HF bottle is empty. The bottle will be replaced Thursday February 14th.
 
[[User:Silva|Silva]] 21:51, 13 February 2019 (PST)
 
   
===== Advanced Vacuum PECVD#2 =====
+
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
The system is down. The rough valve has failed. A work-a-round is being implemented while the valve is being sourced. Hopefully the system will be up by late morning February 14th.
 
[[User:Silva|Silva]] 21:42, 13 February 2019 (PST)
+
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
   
  +
=====Lab Access Changes: Symmetry App=====
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
  +
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
   
 
=====Wafer Bonder, (Suss SB6-8E)=====
<!---------- end of Equipment Status ------------>
 
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
<!---------------------------------------------->
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
  +
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
  +
In order for your post to show up correctly, you need to:
  +
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
  +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<noinclude>[[Category:Templates]]</noinclude>
 
<!--------------------------------------------
 
<!--------------------------------------------
 
====== HOW TO ADD ITEMS ======
 
 
 
 
====== HOW TO ADD NEWS ITEMS ======
 
 
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
+
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Please use "There are no announcements at this time." if the announcements are empty.
 
* Please use "There are no announcements at this time." if the announcements are empty.
   
* URL to the RSS feed via FeedBurner (for Samsung display): http://feeds.feedburner.com/UCSBNanofab-Announcements?format=xml
+
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
* URL to the RSS feed directly from Wiki: https://www.nanotech.ucsb.edu/wiki/index.php?title=Template:Announcements&action=feed&feed=rss
+
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
   
   
Line 60: Line 56:
 
===== NanoFab making LN2 icecream =====
 
===== NanoFab making LN2 icecream =====
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
// ~~~~
 
   
 
************* (end of example) **************
 
************* (end of example) **************
The ~~~~ will be replaced with your username & timestamp after you submit the post.
+
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
 
---------------------------------------------->
 
---------------------------------------------->

Latest revision as of 13:42, 9 May 2024

Atomic Force Microscope (Dimension ICON) - 05/08: AFM Head needs repair

I will have to take the AFM head unit back to Bruker for repair. The height sensor failed all the tests I tried so the Z-piezo/strain gauge unit will most likely need to be replaced. SO for the foreseeable future, the AFM is down.--Demis

//Vraj Mehalana 13:42, 9 May 2024 (PDT)

MA6 TSA is down - Update

Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something.

//Vraj Mehalana 11:15, 1 May 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

ASML optics replacement May 20th-22nd

We will be performing beam delivery optics replacement on Mon May 20th to 22nd, to resolve a low intensity reading. The tool will be unavailable during this time.e.

//Vraj Mehalana 09:40, 9 May 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)