=====Unaxis ICP-PECVD is DOWN=====
<!-- Description of the RSS feed -->
+
RF1 continues to be a problem. I will start the process of elimination from a hardware point of view Monday. Once I resolve the hardware issue our Process group will be exclusively running the system for about a week. During this time we will NOT be allowing anyone else to use the system. Sorry for the inconvenience.
''Equipment Status''
+
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 22 September 2023 (PDT)
 +
 
 +
=====Wafer Bonder, (Suss SB6-8E)=====
 +
The top heater has failed.  We are currently in the process of trying to source a new heater.  we will send out an email once I have an update.
 +
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)
 +
 
 +
=====Dicing Saw (ADT) Upgrade 10/9=====
 +
The dicing saw is scheduled go down for an upgrade on Monday October 9th and will be down for that week and into the weekend. Part of the upgrade will be updated software and will require users to be re-trained. I will provide more info on the re-training once I get a little hands on time with the updated software.
 +
I'll send out a couple of reminder emails between now and then and keep everyone updated in the event the schedule for this changes.
 +
//[[User:Mehalana v|Vraj Mehalana]] 10:33, 6 September 2023 (PDT)
 +
 
 +
=====Stepper #1 (GCA 6300) Scheduled Maintenance=====
 +
The scheduled maintenance activates on 9-28-23 have been cancelled and will be rescheduled at a later date.  The tool is now available to be reserved for use on that date.
 +
//[[User:Mehalana v|Vraj Mehalana]] 10:29, 26 September 2023 (PDT)
 +
 
 +
=====Stepper #2 (GCA Autostep 200) - Scheduled Maintenance=====
 +
The Autostep 200 will be undergoing maintenance and will be unavailable on the following dates and times:
 +
(1) 09-30-23 8:00am-5:00pm
 +
(2) 10-01-23 8:00am-5:00pm
 +
(3) 10-02-23 8:00am-12:00pm
 +
Please plan your work activities accordingly.
 +
//[[User:Mehalana v|Vraj Mehalana]] 13:49, 27 September 2023 (PDT)
 +
 
 +
===== EVG is down=====
 +
I went to check the tool out this morning and found it was not pumping down properly. After further inspection of the tool I found that the lid's quartz liner has cracked. Contacting EVG but the tool will probably be down for some time. I will updated everyone once I have an estimated down time.
 +
//[[User:Mehalana v|Vraj Mehalana]] 11:39, 25 September 2023 (PDT)
 +
 
 
<!--
 
<!--
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
+
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 +
In order for your post to show up correctly, you need to:
 +
>> Use FIVE equal-signs for the Title's heading level.  eg.: ===== my post =====
 +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
  
===== IBD =====
 
The IBD is Down for maintenance. The system will be down until late next week, 11/15/19, or early the following week. We will send out an email once the system is ready to use.
 
[[User:Silva|Silva]] 15:21, 8 November 2019 (PST)
 
 
===== Suss Bonder =====
 
Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options.
 
[[User:Silva|Silva]] 11:16, 25 October 2019 (PDT)
 
 
===== Cleanroom Shutdown on 11/15 =====
 
The cleanroom will be closed from 7-9am on Friday, November 15th for fire system testing.  No one will be allowed in the lab during this time.  Please plan accordingly.
 
[[User:Hopkins a|Hopkins a]] 15:44, 6 November 2019 (PST) 
 
  
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>
<!---------------------------------------------->
+
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<noinclude>[[Category:Templates]]</noinclude>
 
<!--------------------------------------------
 
<!--------------------------------------------
 
+
====== HOW TO ADD ITEMS ======
 
 
 
 
 
 
====== HOW TO ADD NEWS ITEMS ======
 
 
 
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way.  (This looks best on the Wiki homepage)
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way.  (This looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.  
+
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.  
 
* Use double-slash:  //  at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Use double-slash:  //  at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.  
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.  
 
* Please use "There are no announcements at this time." if the announcements are empty.
 
* Please use "There are no announcements at this time." if the announcements are empty.
  
* URL to the RSS feed via FeedBurner (for Samsung display): http://feeds.feedburner.com/UCSBNanofab-Announcements?format=xml
+
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
* URL to the RSS feed directly from Wiki: https://www.nanotech.ucsb.edu/wiki/index.php?title=Template:Announcements&action=feed&feed=rss
+
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
  
  
Line 47: Line 60:
 
===== NanoFab making LN2 icecream =====
 
===== NanoFab making LN2 icecream =====
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
// ~~~~
+
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
  
 
************* (end of example) **************
 
************* (end of example) **************
The ~~~~ will be replaced with your username & timestamp after you submit the post.
+
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
 
---------------------------------------------->
 
---------------------------------------------->

Latest revision as of 13:50, 27 September 2023

Unaxis ICP-PECVD is DOWN

RF1 continues to be a problem. I will start the process of elimination from a hardware point of view Monday. Once I resolve the hardware issue our Process group will be exclusively running the system for about a week. During this time we will NOT be allowing anyone else to use the system. Sorry for the inconvenience. //Vraj Mehalana 14:17, 22 September 2023 (PDT)

Wafer Bonder, (Suss SB6-8E)

The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update. //Vraj Mehalana 09:59, 20 September 2023 (PDT)

Dicing Saw (ADT) Upgrade 10/9

The dicing saw is scheduled go down for an upgrade on Monday October 9th and will be down for that week and into the weekend. Part of the upgrade will be updated software and will require users to be re-trained. I will provide more info on the re-training once I get a little hands on time with the updated software. I'll send out a couple of reminder emails between now and then and keep everyone updated in the event the schedule for this changes. //Vraj Mehalana 10:33, 6 September 2023 (PDT)

Stepper #1 (GCA 6300) Scheduled Maintenance

The scheduled maintenance activates on 9-28-23 have been cancelled and will be rescheduled at a later date. The tool is now available to be reserved for use on that date. //Vraj Mehalana 10:29, 26 September 2023 (PDT)

Stepper #2 (GCA Autostep 200) - Scheduled Maintenance

The Autostep 200 will be undergoing maintenance and will be unavailable on the following dates and times: (1) 09-30-23 8:00am-5:00pm (2) 10-01-23 8:00am-5:00pm (3) 10-02-23 8:00am-12:00pm Please plan your work activities accordingly. //Vraj Mehalana 13:49, 27 September 2023 (PDT)

EVG is down

I went to check the tool out this morning and found it was not pumping down properly. After further inspection of the tool I found that the lid's quartz liner has cracked. Contacting EVG but the tool will probably be down for some time. I will updated everyone once I have an estimated down time. //Vraj Mehalana 11:39, 25 September 2023 (PDT)