Difference between revisions of "Template:Announcements"
Jump to navigation
Jump to search
(→JEOL SEM #2: Up: down) |
m (→JEOL SEM #2: Down: sigfix) |
||
Line 27: | Line 27: | ||
===== JEOL SEM #2: Down ===== |
===== JEOL SEM #2: Down ===== |
||
Load Lock problem. |
Load Lock problem. |
||
− | // [[User:John d| |
+ | // [[User:John d|Posted:]] 13:40, 14 February 2018 (PST) |
===== Cary 500 Down ===== |
===== Cary 500 Down ===== |
Revision as of 14:40, 14 February 2018
UCSB NanoFab Announcements
Announcements
There are no general announcements at this time. // Posted: 09:58, 4 January 2018 (PST)
Gasonics: Up
The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to repaired and returned. // Posted: 10:14, 12 February 2018 (PST)
ASML: Up
ASML Stepper #3 periodic maintenance is complete. System is ready for use. // Posted: 18:52, 10 February 2018 (PST)
JEOL SEM #2: Down
Load Lock problem. // Posted: 13:40, 14 February 2018 (PST)
Cary 500 Down
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. // Posted: 13:47, 12 February 2018 (PST)