Difference between revisions of "Template:Announcements"
Jump to navigation
Jump to search
(→ASML is DOWN: Repair Expected Monday: system up) |
(ASML down) |
||
Line 10: | Line 10: | ||
<!------------- Equipment Status ----------------> | <!------------- Equipment Status ----------------> | ||
− | ===== ASML is | + | ===== ASML is DOWN ===== |
− | + | Laser Gas Fill error - investigating. | |
− | // [[User:John d|John d]] | + | // [[User:John d|John d]] 08:13, 13 January 2020 (PST) |
===== Unaxis ICP-PECVD ===== | ===== Unaxis ICP-PECVD ===== |
Revision as of 09:13, 13 January 2020
Equipment Status
ASML is DOWN
Laser Gas Fill error - investigating. // John d 08:13, 13 January 2020 (PST)
Unaxis ICP-PECVD
The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool. Silva 15:04, 19 November 2019 (PST)
Suss Bonder
Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options. Silva 11:16, 25 October 2019 (PDT)