PECVD1 Wafer Coating Process: Difference between revisions
Jump to navigation
Jump to search
(recipes) |
|||
Line 14: | Line 14: | ||
# Wipe sidewall first with DI water, followed by IPA. |
# Wipe sidewall first with DI water, followed by IPA. |
||
# Load recipe for cleaning. Edit the recipe and enter required time for cleaning. |
# Load recipe for cleaning. Edit the recipe and enter required time for cleaning. |
||
# Log out |
|||
== SiO2 @250C == |
== SiO2 @250C == |
||
Line 28: | Line 29: | ||
# Wipe sidewall first with DI water, followed by IPA. |
# Wipe sidewall first with DI water, followed by IPA. |
||
# Load recipe for cleaning. Edit the recipe and enter required time for cleaning. |
# Load recipe for cleaning. Edit the recipe and enter required time for cleaning. |
||
# Log out |
Revision as of 04:15, 31 March 2020
The wafers used for process calibration are ordered from SVM. These are low particle count 4" Si wafers (particle count<100). The wafers are scanned before and after deposition. They are not re-used. Handling the wafers is important and each step could contribute in adding new particles.
SiN @250C
- Log in to PECVD #1 (Staff account).
- Edit standard recipes (for seasoning, deposition, and cleaning). You can ONLY change the time in recipes.
- Seasoning recipe name
- Deposition recipe name
- Cleaning recipe name:
- Load the seasoning recipe, and run it. The goal of this step is to coat chamber walls and prepare it for deposition.
- Vent the chamber and load a 4"Si wafer (place it in the center of platen). You can place small pieces around the wafer to protect it from moving.
- Pump down.
- Load the deposition recipe, and run it.
- Wait for deposition to be finished. Unload the wafer.
- Wipe sidewall first with DI water, followed by IPA.
- Load recipe for cleaning. Edit the recipe and enter required time for cleaning.
- Log out
SiO2 @250C
- Log in to PECVD #1 (Staff account).
- Edit standard recipes (for seasoning, deposition, and cleaning). You can ONLY change the time in recipes.
- Seasoning recipe name
- Deposition recipe name
- Cleaning recipe name:
- Load the seasoning recipe, and run it. The goal of this step is to coat chamber walls and prepare it for deposition.
- Vent the chamber and load a 4"Si wafer (place it in the center of platen). You can place small pieces around the wafer to protect it from moving.
- Pump down.
- Load the deposition recipe, and run it.
- Wait for deposition to be finished. Unload the wafer.
- Wipe sidewall first with DI water, followed by IPA.
- Load recipe for cleaning. Edit the recipe and enter required time for cleaning.
- Log out