Template:Announcements: Difference between revisions
m (minor reorder) |
(asml update) |
||
Line 16: | Line 16: | ||
===== ASML Down ===== |
===== ASML Down ===== |
||
New Temp Ctl Unit will be installed tomorrow, planning to let it stabilize temps over the weekend. |
|||
We're in the process of installing the new computer and other hardware. |
|||
If it all goes smoothly, we'll run system cals (focus/overlay etc.) on Monday. |
|||
Barring unforseen issues, we expect to have the system running and calibrated by Thursday or Friday. |
|||
New computer and new Mains Power supply have been installed, along with one rack CPU board that failed - these are all operating nominally so far. Nanofiles sync & JobCreator will be reinstituted later next week/following week. All user jobs have be copied over. |
|||
We are installing a new computer on the system. We have all user jobs backed up, so no user data will be lost in the transfer. However, the sync scripts for python ASML-JobCreator scripting will need to be re-written, so the automatic syncing for JobCreator will be unavailable until I rewrite those. |
|||
// [[User:John d|John d]] |
// [[User:John d|John d]] 21:08, 23 June 2022 (PDT) |
||
===== Face-Masks Optional as of June 13 ===== |
===== Face-Masks Optional as of June 13 ===== |
Revision as of 04:08, 24 June 2022
Important Announcements
ASML Down
New Temp Ctl Unit will be installed tomorrow, planning to let it stabilize temps over the weekend. If it all goes smoothly, we'll run system cals (focus/overlay etc.) on Monday.
New computer and new Mains Power supply have been installed, along with one rack CPU board that failed - these are all operating nominally so far. Nanofiles sync & JobCreator will be reinstituted later next week/following week. All user jobs have be copied over. // John d 21:08, 23 June 2022 (PDT)
Face-Masks Optional as of June 13
You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired.
We will still provide masks at the metal table in front of the cleanroom entry. See the UCSB announcement at this link.
See the full policies at COVID-19_User_Policies // John d 11:20, 13 June 2022 (PDT)
PureStrip Bath Heater UP
The temperature controller on the PureStrip vertical bath in Bay 4 acid bench has been replaced, it is ready for use. // John d 08:29, 21 June 2022 (PDT)
Unaxis-Dep: Up
New bottle of Deuterated Silane (SiD4) has been installed, we've qualified the SiO2 process and it looks good. Films are ready to use. // John d 10:11, 17 June 2022 (PDT)
Gasonics Down
Leak in main chamber, tool is down. // John d 14:35, 27 May 2022 (PDT)
New EBL Rates
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:
Industrial Users: $405/hour
UC Academic Users: $126/hour
Non-UC Academic Users: $150/hour
UCSB CNSI Incubator USers: $260/hour
//Thibeault 12:21, 9 December 2021 (PST)