We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm. |
|||
The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd. |
|||
⚫ | |||
=====PECVD2 is up for SiO2 and Std SiN Only===== |
|||
We have adjusted recipes for SiO2 and Std SiN. These are available for use. Read the emails first. |
|||
Low Stress SiN and a-Si are not yet adjusted and are not ready for use. We hope to have these done the week of 11/20 // [[User:Thibeault|Thibeault]] 09:10, 16 November 2023 (PST) |
|||
=====Job Opening: Process Engineer===== |
=====Job Opening: Process Engineer===== |
||
Line 12: | Line 21: | ||
The probe station is up, only the computer is down. Standard electrical probe measurements are still available, just not automated plotting |
The probe station is up, only the computer is down. Standard electrical probe measurements are still available, just not automated plotting |
||
//[[User:Mehalana v|Vraj Mehalana]] 14:29, 3 November 2023 (PDT) |
//[[User:Mehalana v|Vraj Mehalana]] 14:29, 3 November 2023 (PDT) |
||
⚫ | |||
We were able to fix the vacuum leak but unfortunately the particulates are off the chart and rate is still a bit low. Tomorrow morning we will be taking the showerhead apart and cleaning it up before testing again. |
|||
⚫ | |||
=====Wafer Bonder, (Suss SB6-8E)===== |
=====Wafer Bonder, (Suss SB6-8E)===== |
||
Line 21: | Line 26: | ||
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT) |
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT) |
||
<!-- |
<!-- |
||
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
Line 29: | Line 32: | ||
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
--> |
--> |
||
<!----------------------------------------------> |
|||
<!------------- Equipment Status ----------------> |
|||
<!---------- end of Equipment Status ------------> |
|||
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
||
<endfeed /> |
<endfeed /> |
Revision as of 05:09, 17 November 2023
Year End Shutdown
We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm.
The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd. //Vraj Mehalana 14:39, 16 November 2023 (PST)
PECVD2 is up for SiO2 and Std SiN Only
We have adjusted recipes for SiO2 and Std SiN. These are available for use. Read the emails first. Low Stress SiN and a-Si are not yet adjusted and are not ready for use. We hope to have these done the week of 11/20 // Thibeault 09:10, 16 November 2023 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details. //Vraj Mehalana 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
ProbeStation scheduled IT maintenance
The probe station is up, only the computer is down. Standard electrical probe measurements are still available, just not automated plotting //Vraj Mehalana 14:29, 3 November 2023 (PDT)
Wafer Bonder, (Suss SB6-8E)
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.