Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
(47 intermediate revisions by 4 users not shown)
Line 1: Line 1:
<startfeed />
<startfeed />
=====Year End Shutdown=====
We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm.
//[[User:Mehalana v|Vraj Mehalana]] 15:13, 5 December 2023 (PST)
The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd.


//[[User:Mehalana v|Vraj Mehalana]] 14:39, 16 November 2023 (PST)
=====Dicing Saw (ADT) Upgrade 10/9=====
The dicing saw is scheduled go down for an upgrade on Monday October 9th and will be down for that week and into the weekend. Part of the upgrade will be updated software and will require users to be re-trained. I will provide more info on the re-training once I get a little hands on time with the updated software.
I'll send out a couple of reminder emails between now and then and keep everyone updated in the event the schedule for this changes.
//[[User:Mehalana v|Vraj Mehalana]] 10:33, 6 September 2023 (PDT)


=====Stepper #1 (GCA 6300) Scheduled Maintenance=====
=====PECVD2 is up for SiO2 and Std SiN Only=====
We have adjusted recipes for SiO2 and Std SiN. These are available for use. Read the emails first.
The tool has been scheduled for maintenance on 9-28-23 from 8:00am to 5:00pm. During this time the tool will be unavailable for use. Please plan your lab activities accordingly.
Low Stress SiN and a-Si are not yet adjusted and are not ready for use. We hope to have these done the week of 11/20
//[[User:Mehalana v|Vraj Mehalana]] 10:13, 6 September 2023 (PDT)


// [[User:Thibeault|Thibeault]] 09:10, 16 November 2023 (PST)
=====SEM 2 is Up=====
JEOL has finished will the install and the SEM is available to use if you've received training on SEM #1.
//[[User:Hopkins a|Hopkins a]] 15:32, 29 August 2023 (PDT)


=====EVG down Mon Sept 18th=====
=====Job Opening: Process Engineer=====
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
We will have an FSE onsite to install the new parts on the tool and verify it is operating correctly. I don't expect this to take more than a few days, but plan for the tool to be down all week.
//[[User:Mehalana v|Vraj Mehalana]] 14:37, 15 September 2023 (PDT)


//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT)

=====Lab Access Changes: Symmetry App=====
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.

// [[User:John d|John d]] 13:49, 7 November 2023 (PST)

=====Wafer Bonder, (Suss SB6-8E)=====
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.

//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)
=====Sputter #3 (AJA) - Sputter 3 Si target is consumed=====
Do not try to use the Si target, it is completely consumed. I am going to install a new target Friday morning.

Tony
//[[User:Mehalana v|Vraj Mehalana]] 15:13, 6 December 2023 (PST)
<!--
<!--
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Line 24: Line 38:
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
-->
-->
<!---------------------------------------------->
<!------------- Equipment Status ---------------->


<!---------- end of Equipment Status ------------>
<!---------DO NOT EDIT BELOW THIS LINE----------->
<!---------DO NOT EDIT BELOW THIS LINE----------->
<endfeed />
<endfeed />

Revision as of 23:13, 6 December 2023

Year End Shutdown

We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm. //Vraj Mehalana 15:13, 5 December 2023 (PST) The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd.

//Vraj Mehalana 14:39, 16 November 2023 (PST)

PECVD2 is up for SiO2 and Std SiN Only

We have adjusted recipes for SiO2 and Std SiN. These are available for use. Read the emails first. Low Stress SiN and a-Si are not yet adjusted and are not ready for use. We hope to have these done the week of 11/20

// Thibeault 09:10, 16 November 2023 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Vraj Mehalana 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App".

// John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.

//Vraj Mehalana 09:59, 20 September 2023 (PDT)

Sputter #3 (AJA) - Sputter 3 Si target is consumed

Do not try to use the Si target, it is completely consumed. I am going to install a new target Friday morning.

Tony //Vraj Mehalana 15:13, 6 December 2023 (PST)