=====Year End Shutdown===== |
||
We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm. |
|||
RF1 continues to be a problem. I will start the process of elimination from a hardware point of view Monday. Once I resolve the hardware issue our Process group will be exclusively running the system for about a week. During this time we will NOT be allowing anyone else to use the system. Sorry for the inconvenience. |
|||
//[[User:Mehalana v|Vraj Mehalana]] |
//[[User:Mehalana v|Vraj Mehalana]] 15:13, 5 December 2023 (PST) |
||
The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd. |
|||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
===== |
=====PECVD2 is up for SiO2 and Std SiN Only===== |
||
We have adjusted recipes for SiO2 and Std SiN. These are available for use. Read the emails first. |
|||
The dicing saw is scheduled go down for an upgrade on Monday October 9th and will be down for that week and into the weekend. Part of the upgrade will be updated software and will require users to be re-trained. I will provide more info on the re-training once I get a little hands on time with the updated software. |
|||
Low Stress SiN and a-Si are not yet adjusted and are not ready for use. We hope to have these done the week of 11/20 |
|||
I'll send out a couple of reminder emails between now and then and keep everyone updated in the event the schedule for this changes. |
|||
⚫ | |||
// [[User:Thibeault|Thibeault]] 09:10, 16 November 2023 (PST) |
|||
=====Stepper #1 (GCA 6300) Scheduled Maintenance===== |
|||
The scheduled maintenance activates on 9-28-23 have been cancelled and will be rescheduled at a later date. The tool is now available to be reserved for use on that date. |
|||
⚫ | |||
=====Job Opening: Process Engineer===== |
|||
=====Stepper #2 (GCA Autostep 200) - Scheduled Maintenance===== |
|||
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
|||
The Autostep 200 will be undergoing maintenance and will be unavailable on the following dates and times: |
|||
(1) 09-30-23 8:00am-5:00pm |
|||
(2) 10-01-23 8:00am-5:00pm |
|||
(3) 10-02-23 8:00am-12:00pm |
|||
Please plan your work activities accordingly. |
|||
⚫ | |||
⚫ | |||
===== EVG is down===== |
|||
We have received the part to repair the tool but we are still consulting with EVG as to who will be preforming the repair work. We hope to have a better handle on this early next week and will update everyone at that time. -Lee |
|||
=====Lab Access Changes: Symmetry App===== |
|||
⚫ | |||
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
|||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
=====Sputter #3 (AJA) - Sputter 3 Si target is consumed===== |
|||
Do not try to use the Si target, it is completely consumed. I am going to install a new target Friday morning. |
|||
Tony |
|||
⚫ | |||
<!-- |
<!-- |
||
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
Line 34: | Line 38: | ||
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
--> |
--> |
||
<!----------------------------------------------> |
|||
<!------------- Equipment Status ----------------> |
|||
<!---------- end of Equipment Status ------------> |
|||
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
||
<endfeed /> |
<endfeed /> |
Revision as of 23:13, 6 December 2023
Year End Shutdown
We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm. //Vraj Mehalana 15:13, 5 December 2023 (PST) The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd.
//Vraj Mehalana 14:39, 16 November 2023 (PST)
PECVD2 is up for SiO2 and Std SiN Only
We have adjusted recipes for SiO2 and Std SiN. These are available for use. Read the emails first. Low Stress SiN and a-Si are not yet adjusted and are not ready for use. We hope to have these done the week of 11/20
// Thibeault 09:10, 16 November 2023 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.
//Vraj Mehalana 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App".
// John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.
//Vraj Mehalana 09:59, 20 September 2023 (PDT)
Sputter #3 (AJA) - Sputter 3 Si target is consumed
Do not try to use the Si target, it is completely consumed. I am going to install a new target Friday morning.
Tony //Vraj Mehalana 15:13, 6 December 2023 (PST)