Template:Announcements: Difference between revisions
No edit summary |
Mehalana v (talk | contribs) No edit summary |
||
(21 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
===== |
=====Year End Shutdown===== |
||
We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm. |
|||
The ProbeStation will be undergoing IT maintenance and will be unavailable on the following dates : |
|||
⚫ | |||
* 10-30-23 |
|||
The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd. |
|||
* 10-31-23 |
|||
Please plan your work activities accordingly. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 11:58, 17 October 2023 (PDT) |
|||
⚫ | |||
=====PECVD2 Planned Down Time for Maintenance 10-19-23===== |
|||
PECVD2 will be going down on Thursday October 19th for replacement of the hoist. |
|||
This will be an all day event starting at 8:00am. |
|||
Please plan accordingly. |
|||
This was originally planned for 10-2, but we had to reschedule due to other equipment down |
|||
=====PECVD2 is up for SiO2 and Std SiN Only===== |
|||
⚫ | |||
We have adjusted recipes for SiO2 and Std SiN. These are available for use. Read the emails first. |
|||
=====Raith Velion - Tool Up===== |
|||
Low Stress SiN and a-Si are not yet adjusted and are not ready for use. We hope to have these done the week of 11/20 |
|||
The y-axis motor has been replaced and the stage is working well now. Tests overnight have been completed with excellent results. I'll check the source and column alignment this morning, the tool will be available from 10am. |
|||
// [[User:Thibeault|Thibeault]] 09:10, 16 November 2023 (PST) |
|||
- Dan |
|||
=====Job Opening: Process Engineer===== |
|||
//[[User:Mehalana v|Vraj Mehalana]] 10:12, 13 October 2023 (PDT) |
|||
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
|||
=====Unaxis ICP-PECVD is UP for Non-GapFill===== |
|||
Tool is up for NON-GapFill (450W RF Bias) Recipes. Other Std SiO2/SiN deps are available. |
|||
Next Week Monday Oct 16th to Wed 18th we will allow GapFill (450W RF Bias) recipes to be run. |
|||
Please plan your process accordingly. |
|||
Also we are still testing our own GapFill recipe that hopefully reduces flakes. Once this is ready you’ll want to qualify our new recipe to make sure it works for your application, as the old GapFill recipe will eventually be deprecated & disallowed. |
|||
//[[User:Mehalana v|Vraj Mehalana]] |
//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT) |
||
=====Lab Access Changes: Symmetry App===== |
|||
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
|||
⚫ | |||
=====Wafer Bonder, (Suss SB6-8E)===== |
=====Wafer Bonder, (Suss SB6-8E)===== |
||
Line 32: | Line 27: | ||
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT) |
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT) |
||
=====Sputter #3 (AJA) - Sputter 3 Si target is consumed===== |
|||
Do not try to use the Si target, it is completely consumed. I am going to install a new target Friday morning. |
|||
Tony |
|||
===== Dicing Saw Upgrade - Update===== |
|||
⚫ | |||
The upgrade work on the saw is completed. My plan is to work on updating the SOP and running some more tests tomorrow and Monday. If all goes smoothly I should be ready to start re-training users on Tuesday, so I should be sending out an email some time Monday in regard to the re-training schedule. |
|||
-Lee |
|||
⚫ | |||
===== EVG is down===== |
|||
EVG finally has our PO. They are scheduled to be here next week, my guess would be Tuesday. |
|||
-Lee |
|||
//[[User:Mehalana v|Vraj Mehalana]] 10:37, 18 October 2023 (PDT) |
|||
<!-- |
<!-- |
||
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
Line 52: | Line 38: | ||
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
--> |
--> |
||
<!----------------------------------------------> |
|||
<!------------- Equipment Status ----------------> |
|||
<!---------- end of Equipment Status ------------> |
|||
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
||
<endfeed /> |
<endfeed /> |
Revision as of 23:13, 6 December 2023
Year End Shutdown
We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm. //Vraj Mehalana 15:13, 5 December 2023 (PST) The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd.
//Vraj Mehalana 14:39, 16 November 2023 (PST)
PECVD2 is up for SiO2 and Std SiN Only
We have adjusted recipes for SiO2 and Std SiN. These are available for use. Read the emails first. Low Stress SiN and a-Si are not yet adjusted and are not ready for use. We hope to have these done the week of 11/20
// Thibeault 09:10, 16 November 2023 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.
//Vraj Mehalana 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App".
// John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.
//Vraj Mehalana 09:59, 20 September 2023 (PDT)
Sputter #3 (AJA) - Sputter 3 Si target is consumed
Do not try to use the Si target, it is completely consumed. I am going to install a new target Friday morning.
Tony //Vraj Mehalana 15:13, 6 December 2023 (PST)