Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
(12 intermediate revisions by 3 users not shown)
Line 1: Line 1:
<startfeed />
<startfeed />
=====Year End Shutdown=====
We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm.
//[[User:Mehalana v|Vraj Mehalana]] 15:13, 5 December 2023 (PST)
The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd.

//[[User:Mehalana v|Vraj Mehalana]] 14:39, 16 November 2023 (PST)

=====PECVD2 is up for SiO2 and Std SiN Only=====
We have adjusted recipes for SiO2 and Std SiN. These are available for use. Read the emails first.
Low Stress SiN and a-Si are not yet adjusted and are not ready for use. We hope to have these done the week of 11/20

// [[User:Thibeault|Thibeault]] 09:10, 16 November 2023 (PST)


=====Job Opening: Process Engineer=====
=====Job Opening: Process Engineer=====
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT)

=====EBeam2 UP=====
Test run completed without issue. System is ready to use, EXCEPT for heater - contact supervisor for heater use. See email for updates to operating procedure.

//[[User:Mehalana v|Vraj Mehalana]] 11:48, 26 October 2023 (PDT)
=====ProbeStation scheduled IT maintenance=====
The ProbeStation will be undergoing IT maintenance and will be unavailable on the following dates :
* 10-30-23
* 10-31-23
* 11-01-23
* 11-02-23
Please plan your work activities accordingly.


//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT)
//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT)


=====PECVD2 is UP=====
=====Lab Access Changes: Symmetry App=====
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
We were able to fix the vacuum leak but unfortunately the particulates are off the chart and rate is still a bit low. Tomorrow morning we will be taking the showerhead apart and cleaning it up before testing again.
//[[User:Mehalana v|Vraj Mehalana]] 16:48, 31 October 2023 (PDT)
=====Unaxis VLR - GapFill allowed Mon 30th 5pm to Wed 6am=====
We are still working on an improved GapFill recipe.


// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
To allow your processes through, on Monday EVENING at 5pm we will allow the old "450W GapFill" recipe to be run,

- starting Monday Oct 30th, evening at 5pm,

- ending Wed Nov 1st, morning at 6am.

Reminder: You may NOT run the 450W recipe outside these allowed times, and you may Not modify our recipes apart from Dep/Clean TIME.

Let me know if you have any questions.

//[[User:Mehalana v|Vraj Mehalana]] 09:55, 11 October 2023 (PDT)


=====Wafer Bonder, (Suss SB6-8E)=====
=====Wafer Bonder, (Suss SB6-8E)=====
Line 41: Line 27:


//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)
=====Sputter #3 (AJA) - Sputter 3 Si target is consumed=====
Do not try to use the Si target, it is completely consumed. I am going to install a new target Friday morning.


Tony
=====EVG Activation: Up=====
//[[User:Mehalana v|Vraj Mehalana]] 15:13, 6 December 2023 (PST)
The FSE has completed the work on the tool and I have made several test runs without issue.

IMPORTANT - Please see corresponding email for changes in operation.

//[[User:Mehalana v|Vraj Mehalana]] 15:58, 24 October 2023 (PDT)
<!--
<!--
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Line 54: Line 38:
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
-->
-->
<!---------------------------------------------->
<!------------- Equipment Status ---------------->


<!---------- end of Equipment Status ------------>
<!---------DO NOT EDIT BELOW THIS LINE----------->
<!---------DO NOT EDIT BELOW THIS LINE----------->
<endfeed />
<endfeed />

Revision as of 23:13, 6 December 2023

Year End Shutdown

We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm. //Vraj Mehalana 15:13, 5 December 2023 (PST) The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd.

//Vraj Mehalana 14:39, 16 November 2023 (PST)

PECVD2 is up for SiO2 and Std SiN Only

We have adjusted recipes for SiO2 and Std SiN. These are available for use. Read the emails first. Low Stress SiN and a-Si are not yet adjusted and are not ready for use. We hope to have these done the week of 11/20

// Thibeault 09:10, 16 November 2023 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Vraj Mehalana 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App".

// John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.

//Vraj Mehalana 09:59, 20 September 2023 (PDT)

Sputter #3 (AJA) - Sputter 3 Si target is consumed

Do not try to use the Si target, it is completely consumed. I am going to install a new target Friday morning.

Tony //Vraj Mehalana 15:13, 6 December 2023 (PST)