=====DUV is down - Update===== |
|||
contacted our vendor for an update and was told that the parts should ship by this Friday. If all goes well the tool should be up mid next week. |
|||
⚫ | |||
=====PECVD2 Planned Down Time for Maintenance 12-11-23===== |
|||
PECVD2 will be going down on Monday 12-11-23 at 10:00am for replacement of the RF connector and RF Electrode. |
|||
When the work is complete, the process group will be running tests for the remainder of the afternoon. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:07, 13 December 2023 (PST) |
|||
=====Year End Shutdown===== |
=====Year End Shutdown===== |
||
We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm. |
We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm. |
||
⚫ | |||
The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd. |
The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd. |
||
Revision as of 22:07, 13 December 2023
DUV is down - Update
contacted our vendor for an update and was told that the parts should ship by this Friday. If all goes well the tool should be up mid next week.
//Vraj Mehalana 14:07, 13 December 2023 (PST)
PECVD2 Planned Down Time for Maintenance 12-11-23
PECVD2 will be going down on Monday 12-11-23 at 10:00am for replacement of the RF connector and RF Electrode.
When the work is complete, the process group will be running tests for the remainder of the afternoon.
//Vraj Mehalana 14:07, 13 December 2023 (PST)
Year End Shutdown
We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm. The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd.
//Vraj Mehalana 14:39, 16 November 2023 (PST)
PECVD2 is up for SiO2 and Std SiN Only
We have adjusted recipes for SiO2 and Std SiN. These are available for use. Read the emails first. Low Stress SiN and a-Si are not yet adjusted and are not ready for use. We hope to have these done the week of 11/20
// Thibeault 09:10, 16 November 2023 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.
//Vraj Mehalana 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App".
// John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.
//Vraj Mehalana 09:59, 20 September 2023 (PDT)