Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
<startfeed />
<startfeed />
=====ALD Oxford=====
Chamber #1 is currently Down and is expected to be operational again by the end of April 22.
//[[User:Mehalana v|Vraj Mehalana]] 11:55, 18 March 2024 (PDT)

=====DI and Waste Water systems=====
=====DI and Waste Water systems=====
DI and Waste Water systems will be down for upgrade April 5th and 6th.
DI and Waste Water systems will be down for upgrade April 5th and 6th.
//11:53, 18 March 2024 (PDT)
//[[User:Mehalana v|Vraj Mehalana]] 11:55, 18 March 2024 (PDT)
=====ICP1 Down=====
=====ICP1 Down=====
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.

Revision as of 18:55, 18 March 2024

ALD Oxford

Chamber #1 is currently Down and is expected to be operational again by the end of April 22. //Vraj Mehalana 11:55, 18 March 2024 (PDT)

DI and Waste Water systems

DI and Waste Water systems will be down for upgrade April 5th and 6th. //Vraj Mehalana 11:55, 18 March 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Demis D. John 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)