− | '''''Equipment Status''''' |
||
⚫ | |||
− | <!-- |
||
⚫ | |||
⚫ | |||
⚫ | |||
+ | JEOL Service will be here tomorrow morning to look at the situation. They had me try a couple of things today that didn't work. It is pointing to a gun replacement at this point. They do a have a spare gun at the JEOL facility in Pittsburgh ready to go if needed. |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
− | JEOL SEM 2 is down, we are working to get a service engineer on-site ASAP. |
||
⚫ | |||
− | ===== |
+ | =====(JEOL JBX-6300FS) System is UP===== |
− | ISO Spray is no longer required inside the lab. Masks are required only for unvaccinated individuals. |
||
− | There are no distancing or occupancy restrictions. |
||
⚫ | |||
− | Read the latest policies on the [https://wiki.nanotech.ucsb.edu/wiki/COVID-19_User_Policies '''COVID-19 User Policies'''] page. |
||
+ | =====MLA Maintenance 6/24-6/27===== |
||
⚫ | |||
+ | The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the |
||
+ | evenings. |
||
+ | -Lee |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
||
− | ===== Weekly Testing strongly urged for UCSB Students/Staff ===== |
||
− | Free weekly COVID testing is available to UCSB Staff, Faculty and Students. UCSB employees are strongly urged to sign up for weekly testing, which takes only minutes, is administered on-campus and is free of charge. |
||
+ | =====Stepper #1 (GCA 6300) - Tool availability===== |
||
− | Weekly recurring appointments can be made at the Student Health website: |
||
+ | Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times: |
||
− | * Log on to the [https://studenthealthoc.sa.ucsb.edu/login_dualauthentication.aspx '''UCSB Testing Patient Portal'''] using your UCSB NetID and password. |
||
+ | 6-18-24 at 8:00am |
||
− | The Chancellor's [https://chancellor.ucsb.edu/memos/2020-10-15-recommended-covid-19-asymptomatic-campus-testing-program-faculty-staff-and memo to campus with details can be found here]. |
||
+ | Till |
||
⚫ | |||
+ | 6-20-24 at 5:00pm |
||
+ | Please plan your processing activities accordingly. |
||
− | ===== NanoFab COVID Protocols ===== |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
||
− | Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time. |
||
+ | =====Stepper #2 (GCA Autostep 200) - Tool availability===== |
||
− | Contact the [[Brian Thibeault|Lab Director]] for more information. |
||
+ | Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times: |
||
+ | 6-21-24 at 8:00am |
||
− | ''The most recent COVID Protocols can be found at '''[[COVID-19_User_Policies]]'''.'' |
||
+ | Till |
||
+ | 6-21-24 at 5:00pm |
||
+ | Please plan your processing activities accordingly. |
||
⚫ | |||
+ | Thanks |
||
+ | Bill Millerski |
||
+ | UCSB |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
||
+ | =====Velion FIB Tool DOWN===== |
||
− | <!---------- end of Equipment Status ------------> |
||
+ | Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice. |
||
− | <!----------------------------------------------> |
||
⚫ | |||
⚫ | |||
− | <!-------------------------------------------- |
||
⚫ | |||
+ | =====ICP1 Down===== |
||
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
||
+ | =====Lab Access Changes: Symmetry App===== |
||
+ | The iris scanner has been decommissioned. Please use the card reader which supports: |
||
+ | -Physical card |
||
⚫ | |||
+ | -Mobile phone via Symmetry App |
||
+ | |||
+ | //[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
||
+ | |||
+ | =====Wafer Bonder, (Suss SB6-8E)===== |
||
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
||
+ | |||
⚫ | |||
⚫ | |||
+ | In order for your post to show up correctly, you need to: |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
* You can copy/paste the example below for a new news item. |
* You can copy/paste the example below for a new news item. |
||
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
||
− | * You must add a user signature at the end of each post via four tildes: |
+ | * You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
||
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
||
* Please use "There are no announcements at this time." if the announcements are empty. |
* Please use "There are no announcements at this time." if the announcements are empty. |
||
− | * URL to the RSS feed via FeedBurner (for Samsung display): http:// |
+ | * URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
− | * URL to the RSS feed directly from Wiki: https:// |
+ | * URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
Line 70: | Line 89: | ||
===== NanoFab making LN2 icecream ===== |
===== NanoFab making LN2 icecream ===== |
||
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
⚫ | |||
− | // ~~~~ |
||
************* (end of example) ************** |
************* (end of example) ************** |
||
− | The |
+ | The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
----------------------------------------------> |
----------------------------------------------> |
Revision as of 17:01, 14 June 2024
MA6 is up
JEOL Service will be here tomorrow morning to look at the situation. They had me try a couple of things today that didn't work. It is pointing to a gun replacement at this point. They do a have a spare gun at the JEOL facility in Pittsburgh ready to go if needed.
//Vraj Mehalana 16:59, 14 June 2024 (PDT)
(JEOL JBX-6300FS) System is UP
//Vraj Mehalana 16:59, 14 June 2024 (PDT)
MLA Maintenance 6/24-6/27
The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the evenings. -Lee //Vraj Mehalana 16:59, 14 June 2024 (PDT)
Stepper #1 (GCA 6300) - Tool availability
Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times:
6-18-24 at 8:00am Till 6-20-24 at 5:00pm
Please plan your processing activities accordingly. //Vraj Mehalana 16:59, 14 June 2024 (PDT)
Stepper #2 (GCA Autostep 200) - Tool availability
Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times:
6-21-24 at 8:00am Till 6-21-24 at 5:00pm
Please plan your processing activities accordingly.
Thanks Bill Millerski UCSB //Vraj Mehalana 16:59, 14 June 2024 (PDT)
Velion FIB Tool DOWN
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
//Vraj Mehalana 10:58, 30 April 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)