Difference between revisions of "Template:Announcements"
Jump to navigation
Jump to search
(deleted lasb closure) |
Mehalana v (talk | contribs) |
||
(330 intermediate revisions by 7 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
− | <!--feedBurner name="UCSBNanofab-Announcements" /--> |
||
− | <!-- Description of the RSS feed --> |
||
− | '''''Important Announcements''''' |
||
⚫ | |||
− | <!-- |
||
⚫ | |||
⚫ | |||
⚫ | |||
+ | Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice. |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
− | <!------------- Equipment Status ----------------> |
||
⚫ | |||
⚫ | |||
− | LEXT Confocal microscope is down, please check email for updates. |
||
− | For general motorized microscopy, you may consider the new [[Digital_Microscope_(Olympus_DSX1000)|Olympus DSX-1000]]. |
||
⚫ | |||
− | ===== |
+ | =====ICP1 Down===== |
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
− | Please read the linked letter below (on Wiki) regarding masking policy changes, effective Saturday, March 19. |
||
⚫ | |||
+ | =====Lab Access Changes: Symmetry App===== |
||
− | The nanofab will follow this policy with masks being optional for everyone in all sections of the facility beginning March 19. |
||
+ | The iris scanner has been decommissioned. Please use the card reader which supports: |
||
+ | -Physical card |
||
− | All users must adhere to the campus policies as outlined in the letter from Chancellor Yang, including testing where required. |
||
+ | -Mobile phone via Symmetry App |
||
− | Link: [https://t.e2ma.net/message/opq87n/0equghb March 16th 2022- Letter from Office of the Chancellor] |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
||
− | See the full policies at '''[[COVID-19_User_Policies]]''' |
||
⚫ | |||
− | ===== |
+ | =====Wafer Bonder, (Suss SB6-8E)===== |
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
||
− | Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows: |
||
⚫ | |||
⚫ | |||
− | Industrial Users: $405/hour |
||
⚫ | |||
− | |||
⚫ | |||
− | UC Academic Users: $126/hour |
||
⚫ | |||
− | |||
⚫ | |||
− | Non-UC Academic Users: $150/hour |
||
⚫ | |||
− | |||
⚫ | |||
− | UCSB CNSI Incubator USers: $260/hour |
||
− | |||
⚫ | |||
− | |||
− | <!---------- end of Equipment Status ------------> |
||
− | <!----------------------------------------------> |
||
<endfeed /> |
<endfeed /> |
||
<noinclude>[[Category:Templates]]</noinclude> |
<noinclude>[[Category:Templates]]</noinclude> |
||
<!-------------------------------------------- |
<!-------------------------------------------- |
||
⚫ | |||
− | |||
− | |||
− | |||
− | |||
⚫ | |||
− | |||
* You can copy/paste the example below for a new news item. |
* You can copy/paste the example below for a new news item. |
||
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
||
− | * You must add a user signature at the end of each post via four tildes: |
+ | * You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
||
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
||
Line 70: | Line 49: | ||
===== NanoFab making LN2 icecream ===== |
===== NanoFab making LN2 icecream ===== |
||
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
+ | // [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) |
||
− | // ~~~~ |
||
************* (end of example) ************** |
************* (end of example) ************** |
||
− | The |
+ | The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
----------------------------------------------> |
----------------------------------------------> |
Latest revision as of 15:07, 27 June 2024
Velion FIB Tool DOWN
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
//Vraj Mehalana 10:58, 30 April 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)