We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm. |
|||
⚫ | |||
The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd. |
|||
=====ASML: intermittent alignment failures===== |
|||
⚫ | |||
I have determined that the laser used for Alignment is failing, the power is low and it flickers. |
|||
We will order a replacement ASAP and schedule an ASML engineering visit to install + calibrate a new one. |
|||
=====PECVD2 is up for SiO2 and Std SiN Only===== |
|||
We have adjusted recipes for SiO2 and Std SiN. These are available for use. Read the emails first. |
|||
Low Stress SiN and a-Si are not yet adjusted and are not ready for use. We hope to have these done the week of 11/20 |
|||
In the mean time, I'm sorry to say that you will see intermittent "reject" wafers. Please see email for info on recovering from this error. |
|||
// [[User:Thibeault|Thibeault]] 09:10, 16 November 2023 (PST) |
|||
⚫ | |||
=====Job Opening: Process Engineer===== |
|||
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
|||
=====LAB OPEN===== |
|||
⚫ | |||
House vacuum repair has been completed, lab is open for use. |
|||
//[[User:John_d|Demis D. John]] 12:13, 6 September 2024 (PDT) |
|||
=====MLA150: Down===== |
|||
Heidelberg engineer is on site working on repair, we will update as we learn more. |
|||
// [[User:John_d|Demis D. John]] 12:13, 6 September 2024 (PDT) |
|||
⚫ | |||
The IBD is back up. |
|||
With Mike Silva's help, the fixture was recovered without having to vent the loadlock/chamber. |
|||
// [[User:John_d|Demis D. John]] 20:48, 6 September 2024 (PDT) |
|||
⚫ | |||
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed. |
|||
-Aidan |
|||
⚫ | |||
=====EBeam#2: Down===== |
|||
Good news is we have repaired and reinstalled the hoist, thanks Mike B. and Bill. I have tested it and everything looks good. |
|||
However, the repaired bell jar mount is not sliding down the hoist pole like it should. Since the repair involved some welding to the collar that slides down the hoist pole, we surmise that the concentricity was affected by the heat. The mount is back at the machine shop getting honed out. I should have it back to test late today/early tomorrow but it may have to go back again. Once it is able to slide on properly the tool should be up shortly thereafter. |
|||
-Lee // [[User:John_d|Demis D. John]] 14:24, 27 August 2024 (PDT) |
|||
=====YES EcoClean: 3kW only===== |
|||
I swapped out the RF generator and the tool is working again. I am getting repeated CCP warnings for the 0.7kW recipes so we will need to look into that further. |
|||
System is up for 3kW recipes only. |
|||
DO NOT run 0.7kW recipes until further notice!! |
|||
-- |
|||
Lee Sawyer//[[User:John_d|Demis D. John]] 11:31, 23 August 2024 (PDT) |
|||
=====ICP1 Down===== |
|||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
⚫ | |||
=====Lab Access Changes: Symmetry App===== |
=====Lab Access Changes: Symmetry App===== |
||
The iris scanner has been decommissioned. Please use the card reader which supports: |
|||
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
|||
-Physical card |
|||
-Mobile phone via Symmetry App |
|||
// [[User:John d|John d]] 13:49, 7 November 2023 (PST) |
|||
⚫ | |||
⚫ | |||
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update. |
|||
⚫ | |||
<!-- |
<!-- |
||
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
Revision as of 03:48, 7 September 2024
ASML: intermittent alignment failures
I have determined that the laser used for Alignment is failing, the power is low and it flickers.
We will order a replacement ASAP and schedule an ASML engineering visit to install + calibrate a new one.
In the mean time, I'm sorry to say that you will see intermittent "reject" wafers. Please see email for info on recovering from this error.
// Demis D. John 18:14, 6 September 2024 (PDT)
LAB OPEN
House vacuum repair has been completed, lab is open for use. //Demis D. John 12:13, 6 September 2024 (PDT)
MLA150: Down
Heidelberg engineer is on site working on repair, we will update as we learn more. // Demis D. John 12:13, 6 September 2024 (PDT)
IBD is UP
The IBD is back up.
With Mike Silva's help, the fixture was recovered without having to vent the loadlock/chamber. // Demis D. John 20:48, 6 September 2024 (PDT)
Suss SB6-8E
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)
EBeam#2: Down
Good news is we have repaired and reinstalled the hoist, thanks Mike B. and Bill. I have tested it and everything looks good.
However, the repaired bell jar mount is not sliding down the hoist pole like it should. Since the repair involved some welding to the collar that slides down the hoist pole, we surmise that the concentricity was affected by the heat. The mount is back at the machine shop getting honed out. I should have it back to test late today/early tomorrow but it may have to go back again. Once it is able to slide on properly the tool should be up shortly thereafter.
-Lee // Demis D. John 14:24, 27 August 2024 (PDT)
YES EcoClean: 3kW only
I swapped out the RF generator and the tool is working again. I am getting repeated CCP warnings for the 0.7kW recipes so we will need to look into that further.
System is up for 3kW recipes only.
DO NOT run 0.7kW recipes until further notice!!
-- Lee Sawyer//Demis D. John 11:31, 23 August 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App