=====Stepper #1 (GCA 6300) - Scheduled Maintenance===== |
|||
The tool will be undergoing maintenance and be unavailable the following dates and times: |
|||
=====ASML: intermittent alignment failures===== |
|||
1-18-24 at 8:00am to 1-18-24 at 6:00pm |
|||
I have determined that the laser used for Alignment is failing, the power is low and it flickers. |
|||
We will order a replacement ASAP and schedule an ASML engineering visit to install + calibrate a new one. |
|||
Please plan your processing activities accordingly. |
|||
In the mean time, I'm sorry to say that you will see intermittent "reject" wafers. Please see email for info on recovering from this error. |
|||
Bill Millerski |
|||
//[[User: |
// [[User:John_d|Demis D. John]] 18:14, 6 September 2024 (PDT) |
||
⚫ | |||
===== Stepper #2 (GCA Autostep 200) - Scheduled Maintenance===== |
|||
House vacuum repair has been completed, lab is open for use. |
|||
The tool will be undergoing maintenance and be unavailable the following dates and times: |
|||
//[[User:John_d|Demis D. John]] 12:13, 6 September 2024 (PDT) |
|||
=====MLA150: Down===== |
|||
1-15-24 at 8:00am to 1-17-24 at 6:00pm |
|||
Heidelberg engineer is on site working on repair, we will update as we learn more. |
|||
// [[User:John_d|Demis D. John]] 12:13, 6 September 2024 (PDT) |
|||
=====IBD is UP===== |
|||
Please plan your processing activities accordingly. |
|||
The IBD is back up. |
|||
With Mike Silva's help, the fixture was recovered without having to vent the loadlock/chamber. |
|||
⚫ | |||
// [[User:John_d|Demis D. John]] 20:48, 6 September 2024 (PDT) |
|||
===== |
=====Suss SB6-8E===== |
||
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed. |
|||
Parts were scheduled to arrive last Thursday but were delayed due to the weather that day. Tracking status never updated from pending after that point so I had to wait 7 days before filing a claim with FEDEX. Hopefully the claim and associated dollar value will get them to start looking for the package, and we are also exploring other options. |
|||
-Aidan |
|||
I'll hopefully send out another update late next week with some idea of when we will have parts. |
|||
//[[User:Mehalana v|Vraj Mehalana]] |
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT) |
||
=====PECVD2 Planned Down Time for Maintenance 12-11-23===== |
|||
PECVD2 will be going down on Monday 12-11-23 at 10:00am for replacement of the RF connector and RF Electrode. |
|||
=====EBeam#2: Down===== |
|||
When the work is complete, the process group will be running tests for the remainder of the afternoon. |
|||
Good news is we have repaired and reinstalled the hoist, thanks Mike B. and Bill. I have tested it and everything looks good. |
|||
However, the repaired bell jar mount is not sliding down the hoist pole like it should. Since the repair involved some welding to the collar that slides down the hoist pole, we surmise that the concentricity was affected by the heat. The mount is back at the machine shop getting honed out. I should have it back to test late today/early tomorrow but it may have to go back again. Once it is able to slide on properly the tool should be up shortly thereafter. |
|||
⚫ | |||
⚫ | |||
We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm. |
|||
The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd. |
|||
//[[User: |
-Lee // [[User:John_d|Demis D. John]] 14:24, 27 August 2024 (PDT) |
||
===== |
=====YES EcoClean: 3kW only===== |
||
I swapped out the RF generator and the tool is working again. I am getting repeated CCP warnings for the 0.7kW recipes so we will need to look into that further. |
|||
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
|||
System is up for 3kW recipes only. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT) |
|||
DO NOT run 0.7kW recipes until further notice!! |
|||
-- |
|||
Lee Sawyer//[[User:John_d|Demis D. John]] 11:31, 23 August 2024 (PDT) |
|||
=====ICP1 Down===== |
|||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
⚫ | |||
=====Lab Access Changes: Symmetry App===== |
=====Lab Access Changes: Symmetry App===== |
||
The iris scanner has been decommissioned. Please use the card reader which supports: |
|||
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
|||
-Physical card |
|||
-Mobile phone via Symmetry App |
|||
// [[User:John d|John d]] 13:49, 7 November 2023 (PST) |
|||
⚫ | |||
=====Wafer Bonder, (Suss SB6-8E)===== |
|||
SUSS now aims to be on site in early February. I’ll will send out an email once I get confirmation for a specific date. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
|||
<!-- |
<!-- |
Revision as of 03:48, 7 September 2024
ASML: intermittent alignment failures
I have determined that the laser used for Alignment is failing, the power is low and it flickers.
We will order a replacement ASAP and schedule an ASML engineering visit to install + calibrate a new one.
In the mean time, I'm sorry to say that you will see intermittent "reject" wafers. Please see email for info on recovering from this error.
// Demis D. John 18:14, 6 September 2024 (PDT)
LAB OPEN
House vacuum repair has been completed, lab is open for use. //Demis D. John 12:13, 6 September 2024 (PDT)
MLA150: Down
Heidelberg engineer is on site working on repair, we will update as we learn more. // Demis D. John 12:13, 6 September 2024 (PDT)
IBD is UP
The IBD is back up.
With Mike Silva's help, the fixture was recovered without having to vent the loadlock/chamber. // Demis D. John 20:48, 6 September 2024 (PDT)
Suss SB6-8E
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)
EBeam#2: Down
Good news is we have repaired and reinstalled the hoist, thanks Mike B. and Bill. I have tested it and everything looks good.
However, the repaired bell jar mount is not sliding down the hoist pole like it should. Since the repair involved some welding to the collar that slides down the hoist pole, we surmise that the concentricity was affected by the heat. The mount is back at the machine shop getting honed out. I should have it back to test late today/early tomorrow but it may have to go back again. Once it is able to slide on properly the tool should be up shortly thereafter.
-Lee // Demis D. John 14:24, 27 August 2024 (PDT)
YES EcoClean: 3kW only
I swapped out the RF generator and the tool is working again. I am getting repeated CCP warnings for the 0.7kW recipes so we will need to look into that further.
System is up for 3kW recipes only.
DO NOT run 0.7kW recipes until further notice!!
-- Lee Sawyer//Demis D. John 11:31, 23 August 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)