Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
 
(124 intermediate revisions by 4 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
=====ASML Stepper #3: Down=====
 
The new CPU board we need is being shipped from overseas - will update when we have an ETA.
 
// [[User:John_d|Demis D. John]] 17:17, 4 January 2024 (PST)
 
   
=====DUV Flood: UP with new procedure=====
+
=====Stepper #3 (ASML DUV) - Tool down=====
  +
Wafer stage positioning laser is dying, Asml engineers will be on site Monday and Tuesday to repair. We have the replacement already on hand.
The new parts have been installed and the tool has been tested.
 
   
  +
Unfortunately, we cannot initialize the stage at this time. System is down. // [[User:Mehalana v|Vraj Mehalana]] 18:36, 3 October 2024 (PDT)
We have added a timer that interlocks the lamp power supply since some users seem to have a problem remembering to turn the tool off when finished with it. The minimum time it can be set for is 30 minutes and the max is 3 hours. You will no longer be operating the main breaker on the front of the power supply. I have updated the SOP to reflect the changes, there is a copy at the tool and on its Wiki page:
 
   
  +
=====MLA Service Complete=====
[[https://wiki.nanofab.ucsb.edu/w/images/8/89/DUV_Flood_Expose_SOP_Rev_C.pdf DUV_Flood_Expose_SOP_Rev_C.pdf]]
 
  +
The FSE has completed their work.
// [[User:John_d|Demis D. John]] 17:18, 4 January 2024 (PST)
 
   
  +
I ran beam offset checks on both lasers prior to the maintenance and found that the Y axis value for the 405 laser was off by ~0.6 µm. I made the necessary change and ran another check with all values in spec. I also ran beam offset checks on both laser post maintenance along with an overlay exposure and all looked good.
=====Stepper #1 (GCA 6300) - Scheduled Maintenance=====
 
The tool will be undergoing maintenance and be unavailable the following dates and times:
 
   
  +
Tool is available to use.
1-18-24 at 8:00am to 1-18-24 at 6:00pm
 
   
 
-Lee // [[User:John_d|Demis D. John]] 17:46, 2 October 2024 (PDT)
Please plan your processing activities accordingly.
 
   
 
=====Suss SB6-8E=====
Bill Millerski
 
  +
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
   
  +
-Aidan
//[[User:Mehalana v|Vraj Mehalana]] 21:49, 21 December 2023 (PST)
 
 
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT)
   
 
=====ICP1 Down=====
===== Stepper #2 (GCA Autostep 200) - Scheduled Maintenance=====
 
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
The tool will be undergoing maintenance and be unavailable the following dates and times:
 
 
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
   
 
=====Lab Access Changes: Symmetry App=====
1-15-24 at 8:00am to 1-17-24 at 6:00pm
 
  +
The iris scanner has been decommissioned. Please use the card reader which supports:
   
  +
-Physical card
Please plan your processing activities accordingly.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 21:49, 21 December 2023 (PST)
 
 
=====Job Opening: Process Engineer=====
 
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT)
 
 
=====Lab Access Changes: Symmetry App=====
 
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
   
  +
-Mobile phone via Symmetry App
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
=====Wafer Bonder, (Suss SB6-8E)=====
 
SUSS now aims to be on site in early February. I’ll will send out an email once I get confirmation for a specific date.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
 
   
 
<!--
 
<!--

Latest revision as of 18:36, 3 October 2024

Stepper #3 (ASML DUV) - Tool down

Wafer stage positioning laser is dying, Asml engineers will be on site Monday and Tuesday to repair. We have the replacement already on hand.

Unfortunately, we cannot initialize the stage at this time. System is down. // Vraj Mehalana 18:36, 3 October 2024 (PDT)

MLA Service Complete

The FSE has completed their work.

I ran beam offset checks on both lasers prior to the maintenance and found that the Y axis value for the 405 laser was off by ~0.6 µm. I made the necessary change and ran another check with all values in spec. I also ran beam offset checks on both laser post maintenance along with an overlay exposure and all looked good.

Tool is available to use.

-Lee // Demis D. John 17:46, 2 October 2024 (PDT)

Suss SB6-8E

When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.

-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)