Template:Announcements: Difference between revisions
Mehalana v (talk | contribs) No edit summary |
(deleted ASML update) |
||
(68 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
⚫ | |||
EBeam4 is back up. |
|||
⚫ | |||
The overnight regen of the cryo was completed this morning. |
|||
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed. |
|||
I then tested the operation of the hoist numerous times without issue. |
|||
I tested the EBeam by running 200A of Ti without issue. |
|||
-Aidan |
|||
System UP |
|||
⚫ | |||
//10:36, 30 May 2024 (PDT) |
|||
=====Stepper #1 (GCA 6300) - Tool availability===== |
|||
Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times: |
|||
6-18-24 at 8:00am |
|||
Till |
|||
6-20-24 at 5:00pm |
|||
Please plan your processing activities accordingly. |
|||
//13:32, 1 June 2024 (PDT) |
|||
=====Stepper #2 (GCA Autostep 200) - Tool availability===== |
|||
Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times: |
|||
6-21-24 at 8:00am |
|||
Till |
|||
6-21-24 at 5:00pm |
|||
Please plan your processing activities accordingly. |
|||
Thanks |
|||
Bill Millerski |
|||
UCSB |
|||
//13:32, 1 June 2024 (PDT) |
|||
=====Stepper #3 (ASML DUV) - System UP and calibrated===== |
|||
We have finished calibrations, |
|||
System is up. |
|||
Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose. |
|||
⚫ | |||
=====Unaxis VLR still Down===== |
|||
The chiller has a decent sized ball of ice inside of it. |
|||
I need to let that melt off before I can do a proper diagnosis of what is causing the high pressure cut off to trip when the refrigerant pressures seem normal. |
|||
//13:29, 1 June 2024 (PDT) |
|||
//[[User:Mehalana v|Vraj Mehalana]] 11:17, 24 May 2024 (PDT) |
|||
=====Atomic Force Microscope (Dimension ICON) - 05/17: System UP===== |
|||
Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder! |
|||
//[[User:Mehalana v|Vraj Mehalana]] 13:46, 20 May 2024 (PDT) |
|||
=====MA6 TSA is down - Update===== |
|||
Due to unforeseen circumstances our FSE will not be onsite next week to work on the TSA microscope. They have rescheduled with us for Thursday of the following week, 6/13. I apologize for the inconvenience. |
|||
Per my previous email, there is a MA6 available for use at CNSI. Here is a link to the webpage for their tools: |
|||
https://www.cnsi.ucsb.edu/facilities/quantum-structures/nanofabrication |
|||
-Lee |
|||
//15:59, 22 May 2024 (PDT) |
|||
=====Velion FIB Tool DOWN===== |
|||
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT) |
|||
=====ICP1 Down===== |
=====ICP1 Down===== |
||
Line 82: | Line 18: | ||
-Mobile phone via Symmetry App |
-Mobile phone via Symmetry App |
||
// |
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
||
=====Wafer Bonder, (Suss SB6-8E)===== |
|||
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
|||
<!-- |
<!-- |
Latest revision as of 00:45, 7 November 2024
Suss SB6-8E
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)