Template:Announcements: Difference between revisions
Mehalana v (talk | contribs) |
|||
(37 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
===== |
=====Lab Shutdown: Dec 26 to Jan 3rd===== |
||
===== |
|||
Sorry to say, I was not able to remedy the wafer handling pick up issue, and the system still intermittent,y fails to pick up a wafer correctly. I might have a temporary workaround by using specific slots and such, but I would need to help you do this. |
|||
I have ordered a replacement for the possibly failing WH board causing this. |
|||
We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed. |
|||
Let me know if you want to try and run one or two wafers through and I might be able to help you do this, but I was having difficulty getting exposures to run properly. |
|||
During the shutdown this year we will be pulling all cleanroom suits and stocking new suits. |
|||
To fix the main alignment, laser issue, Asml engineers will be on site Monday and Tuesday next week, so the tool will be down during that time to perform the repairs. |
|||
PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH |
|||
//[[User:Mehalana v|Vraj Mehalana]] 17:46, 11 September 2024 (PDT) |
|||
⚫ | |||
=====LAB OPEN===== |
|||
House vacuum repair has been completed, lab is open for use. |
|||
⚫ | |||
===== |
=====New Gowns in Jan===== |
||
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. |
|||
Heidelberg engineer is on site working on repair, we will update as we learn more. |
|||
// [[User:John_d|Demis D. John]] |
// [[User:John_d|Demis D. John]] 16:58, 24 November 2024 (UTC) |
||
=====IBD is UP===== |
|||
The IBD is back up. |
|||
With Mike Silva's help, the fixture was recovered without having to vent the loadlock/chamber. |
|||
// [[User:John_d|Demis D. John]] 20:48, 6 September 2024 (PDT) |
|||
=====Suss SB6-8E===== |
=====Suss SB6-8E===== |
||
Line 31: | Line 20: | ||
-Aidan |
-Aidan |
||
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT) |
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT) |
||
=====EBeam#2: Down===== |
|||
Good news is we have repaired and reinstalled the hoist, thanks Mike B. and Bill. I have tested it and everything looks good. |
|||
However, the repaired bell jar mount is not sliding down the hoist pole like it should. Since the repair involved some welding to the collar that slides down the hoist pole, we surmise that the concentricity was affected by the heat. The mount is back at the machine shop getting honed out. I should have it back to test late today/early tomorrow but it may have to go back again. Once it is able to slide on properly the tool should be up shortly thereafter. |
|||
-Lee // [[User:John_d|Demis D. John]] 14:24, 27 August 2024 (PDT) |
|||
=====YES EcoClean: 3kW only===== |
|||
I swapped out the RF generator and the tool is working again. I am getting repeated CCP warnings for the 0.7kW recipes so we will need to look into that further. |
|||
System is up for 3kW recipes only. |
|||
DO NOT run 0.7kW recipes until further notice!! |
|||
-- |
|||
Lee Sawyer//[[User:John_d|Demis D. John]] 11:31, 23 August 2024 (PDT) |
|||
=====ICP1 Down===== |
=====ICP1 Down===== |
Latest revision as of 16:58, 24 November 2024
Lab Shutdown: Dec 26 to Jan 3rd
We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed.
During the shutdown this year we will be pulling all cleanroom suits and stocking new suits.
PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH
//Demis D. John 16:55, 24 November 2024 (UTC)
New Gowns in Jan
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. // Demis D. John 16:58, 24 November 2024 (UTC)
Suss SB6-8E
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)