===== E- Beam #2 Maint Work Next Week=====
=====Lab Shutdown: Dec 26 to Jan 3rd=====
E-Beam #2 will be down next Wednesday (10/16) and possibly into Thursday to replace the hoist sensors to something more modern. This will also reduce the likely hood of future issues with the hoist which we dealt with recently. I will send an email out once the work is completed.


We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed.
-Lee
//[[User:Mehalana v|Vraj Mehalana]] 13:23, 10 October 2024 (PDT)


During the shutdown this year we will be pulling all cleanroom suits and stocking new suits.
=====Stepper #3 (ASML DUV) - Tool UP=====
We finished calibrations, tool is up and ready for use.
No limit on number of wafers.


PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH
Input has been set back to port # 1 (right) cassette, outputting to Left cassette (Port #2). // [[User:John_d|Demis D. John]] 17:36, 9 October 2024 (PDT)

//[[User:John_d|Demis D. John]] 16:55, 24 November 2024 (UTC)

=====New Gowns in Jan=====
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use.
// [[User:John_d|Demis D. John]] 16:58, 24 November 2024 (UTC)


=====Suss SB6-8E=====
=====Suss SB6-8E=====

Latest revision as of 16:58, 24 November 2024

Lab Shutdown: Dec 26 to Jan 3rd

We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed.

During the shutdown this year we will be pulling all cleanroom suits and stocking new suits.

PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH

//Demis D. John 16:55, 24 November 2024 (UTC)

New Gowns in Jan

We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. // Demis D. John 16:58, 24 November 2024 (UTC)

Suss SB6-8E

When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.

-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App