Template:Announcements: Difference between revisions
Mehalana v (talk | contribs) No edit summary |
(suss update) |
||
(150 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
=====E-Beam #2 Heater is down - Update===== |
|||
I am fairly certain the heater controller has failed. I have spoken with the vendor and they are looking into it, but we will most likely have to send the unit in. I will push to have a replacement controller sent instead, but since this is a warranty repair they will probably want to eval it in-house. I would plan for it to be down for at least a couple of weeks. I'll send out an update once I have more info. |
|||
=====Oxford ALD+Ion Mill===== |
|||
⚫ | |||
The vendor (Oxford) will be on site Tuesday the 10th until Friday the 13th to address various issues with this tool and it will be unavailable for use. -- Millerski |
|||
// [[User:John_d|Demis D. John]] 00:34, 8 December 2024 (UTC) |
|||
===== |
=====Holography/PL: HeCd Laser Down Mon Dec 16th===== |
||
The 325nm UV Laser will be unavailable from Mon. Dec 16th, through the christmas shutdown, and will be available again on Monday Jan 6th (or possibly earlier). |
|||
contacted our vendor for an update and was told that the parts should ship by this Friday. If all goes well the tool should be up mid next week. |
|||
We will be installing the refurbished laser which will have higher output power. |
|||
Holography will be unavailable during this time, but all other PL lasers will be available. |
|||
⚫ | |||
// [[User:John_d|Demis D. John]] 17:56, 7 December 2024 (UTC) |
|||
===== |
=====Lab Shutdown: Dec 26 to Jan 3rd===== |
||
PECVD2 will be going down on Monday 12-11-23 at 10:00am for replacement of the RF connector and RF Electrode. |
|||
⚫ | |||
When the work is complete, the process group will be running tests for the remainder of the afternoon. |
|||
During the shutdown this year we will be pulling all cleanroom suits and stocking new suits. |
|||
⚫ | |||
⚫ | |||
⚫ | |||
The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd. |
|||
PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH |
|||
⚫ | |||
⚫ | |||
=====Job Opening: Process Engineer===== |
|||
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
|||
⚫ | |||
//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT) |
|||
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. |
|||
⚫ | |||
⚫ | |||
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests. |
|||
I will send out an update once we have one. |
|||
-Aidan |
|||
// [[User:John_d|Demis D. John]] 00:35, 8 December 2024 (UTC) |
|||
=====ICP1 Down===== |
|||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
⚫ | |||
=====Lab Access Changes: Symmetry App===== |
=====Lab Access Changes: Symmetry App===== |
||
The iris scanner has been decommissioned. Please use the card reader which supports: |
|||
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
|||
-Physical card |
|||
-Mobile phone via Symmetry App |
|||
⚫ | |||
⚫ | |||
⚫ | |||
SUSS now aims to be on site in early February. I’ll will send out an email once I get confirmation for a specific date. |
|||
⚫ | |||
<!-- |
<!-- |
Revision as of 00:35, 8 December 2024
Oxford ALD+Ion Mill
The vendor (Oxford) will be on site Tuesday the 10th until Friday the 13th to address various issues with this tool and it will be unavailable for use. -- Millerski // Demis D. John 00:34, 8 December 2024 (UTC)
Holography/PL: HeCd Laser Down Mon Dec 16th
The 325nm UV Laser will be unavailable from Mon. Dec 16th, through the christmas shutdown, and will be available again on Monday Jan 6th (or possibly earlier). We will be installing the refurbished laser which will have higher output power.
Holography will be unavailable during this time, but all other PL lasers will be available. // Demis D. John 17:56, 7 December 2024 (UTC)
Lab Shutdown: Dec 26 to Jan 3rd
We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed.
During the shutdown this year we will be pulling all cleanroom suits and stocking new suits.
PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH
//Demis D. John 16:55, 24 November 2024 (UTC)
New Gowns in Jan
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. // Demis D. John 16:58, 24 November 2024 (UTC)
Suss SB6-8E
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests.
I will send out an update once we have one. -Aidan // Demis D. John 00:35, 8 December 2024 (UTC)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)