added process maturity ranking description at top |
mNo edit summary |
||
| Line 4: | Line 4: | ||
===Dry Etching Tools/Materials Table=== |
===Dry Etching Tools/Materials Table=== |
||
==== Process Maturity |
==== Process Maturity Ranking ==== |
||
* <code>'''R6'''</code> - most mature process with regular calibrations recorded on SPC charts. |
* <code>'''R6'''</code> - most mature process with regular calibrations recorded on SPC charts. |
||
| Line 806: | Line 806: | ||
|} |
|} |
||
=== |
===Process Ranking Table=== |
||
Processes in the table above are ranked by their "''Process Maturity Level''" as follows: |
Processes in the table above are ranked by their "''Process Maturity Level''" as follows: |
||
{| class="wikitable" |
{| class="wikitable" |
||
Revision as of 23:32, 6 August 2025
Process Control Data
See above linked page for process control data (dep rate/stress etc. over time), for a selection of often-used dry etches
Dry Etching Tools/Materials Table
Process Maturity Ranking
R6- most mature process with regular calibrations recorded on SPC charts.- …
R1- least mature - only run once ever.
The Key/Legend for this table's A...R6 values is at the bottom of the page.
Process Ranking Table
Processes in the table above are ranked by their "Process Maturity Level" as follows:
| Process Level | Description of Process Level Ranking | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| A | Process Allowed and materials available but never done | ||||||||||
| R1 | Process has been run at least once | ||||||||||
| R2 | Process has been run and/or procedure is documented or/and data available | ||||||||||
| R3 | Process has been run, procedure is documented, and data is available | ||||||||||
| R4 | Process has a documented procedure with regular (≥4x per year) data or lookahead/in-situ control available | ||||||||||
| R5 | Process has a documented procedure with regular (≥4x per year) data and lookahead/in-situ control available | ||||||||||
| R6 | Process has a documented procedure, regular ( ≥4x per year) data, and control charts & limits available | ||||||||||