=====MLA is down=====
=====Oxford Flexal ALD=====
The PM is proceeding slower than expected. As such, I currently anticipate that the tool will be available for use by the end of the day on Friday.
After some troubleshooting and a bunch of back and forth with HIMT, we have concluded that there is a mechanical failure in the Z drive for the writehead. This will require the writehead to be replaced for which I do not have an ETA. I'll update everyone once I know more.


Sorry for any inconvenience this may cause.
-Lee
//[[User:Mehalana v|Vraj Mehalana]] 23:51, 28 July 2025 (UTC)
=====EBeam1 is UP=====
EBeam1 is back UP


Thanks
Late this morning, the hoist motor was finally delivered, and as soon as it arrived I started the installation.
Bill Millerski
I then tested the Egun operation due to the new high voltage feed throughs that were installed earlier this week.
//[[User:Mehalana v|Vraj Mehalana]] 21:12, 12 August 2025 (UTC)

All tests were completed without issue. System UP.
// 04:23, 25 July 2025 (UTC)

===== SignupMonkey + Wiki: Off-Campus Access=====
Due to a DDoS attack affecting the Signupmonkey server, we have restricted access to the website to US locations only, including both the Nanofab Wiki and Signupmonkey.

If you are off-campus and experiencing issues, please utilize the UCSB VPN to access our sites. Here are the installation instructions for VPN on your device. You will need your UCSB NetID for download and installation - you would have received a UCSB NetID when you started using the NanoFab:

https://it.ucsb.edu/ivanti-secure-access-campus-vpn/get-connected-campus-vpn

-- Vraj
// [[User:John_d|Demis D. John]] 20:08, 22 April 2025 (UTC)


=====Suss SB6-8E=====
=====Suss SB6-8E=====
This tool is down indefinitely. We are sourcing manual bonding fixtures, and already have a 1cm bonding fixture for NanoFab users to use - please contact [[Demis D. John]] for more information.
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests.
// [[User:John_d|Demis D. John]] 04:28, 5 August 2025 (UTC)

I will send out an update once we have one.
-Aidan
// [[User:John_d|Demis D. John]] 00:35, 8 December 2024 (UTC)


=====ICP1 Down=====
=====ICP1 Down=====

Revision as of 22:24, 13 August 2025

Oxford Flexal ALD

The PM is proceeding slower than expected. As such, I currently anticipate that the tool will be available for use by the end of the day on Friday.

Sorry for any inconvenience this may cause.

Thanks Bill Millerski //Vraj Mehalana 21:12, 12 August 2025 (UTC)

Suss SB6-8E

This tool is down indefinitely. We are sourcing manual bonding fixtures, and already have a 1cm bonding fixture for NanoFab users to use - please contact Demis D. John for more information. // Demis D. John 04:28, 5 August 2025 (UTC)

ICP1 Down