Template:Announcements: Difference between revisions
Jump to navigation
Jump to search
Content deleted Content added
Mehalana v (talk | contribs) Feed Appended |
mNo edit summary |
||
| (333 intermediate revisions by 7 users not shown) | |||
| Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
=====Stepper #3 (ASML DUV) - Maintenance April 10th week===== |
|||
=====Christmas Lab Shutdown: Dec 22-25===== |
|||
ASML engineers will be performing periodic maintenance the week of April 10th. |
|||
Users, |
|||
Please plan for the system to be down ~10a Monday April 10th, until Friday that week. |
|||
To perform annual maintenance, we are planning to have the lab shut down from '''''9 am on Monday December 22 through 9 am Friday December 26th'''''. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 09:17, 4 April 2023 (PDT) |
|||
=====Filmetrics F50: UP===== |
|||
Please plan accordingly. |
|||
The F50-WaferMapper’s laptop has been Replaced. |
|||
- Peder Lenvik |
|||
// [[User:Mehalana v|Vraj Mehalana]] 16:53, 22 March 2023 (PDT) |
|||
// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC) |
|||
=====FEI SEM#1 Replacement Project===== |
|||
The FEI SEM #1 will be removed and replaced starting Friday March 17th. Both SEMs will be shut down and the SEM room will be off limits beginning at 8 am Friday and return to normal operations Tuesday morning the 21st. |
|||
=====Announcements moved===== |
|||
//[[User:Mehalana v|Vraj Mehalana]] 10:55, 16 March 2023 (PDT) |
|||
Please check the announcements in SignupMonkey for equipment notifications. |
|||
<!--feedBurner name="UCSBNanofab-Announcements" /--> |
|||
// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC) |
|||
<!-- Description of the RSS feed --> |
|||
<!-- |
<!-- |
||
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
| Line 18: | Line 19: | ||
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
--> |
--> |
||
<!----------------------------------------------> |
|||
<!------------- Equipment Status ----------------> |
|||
===== Unaxis Etch: Down ===== |
|||
We had to take the VAT controller off of this module to get the ICP-PECVD running. I have no immediate ETA for this system coming back online. Until we get this system running again you will need to use the Oxford Cobra system. -- Tony |
|||
// [[User:John d|John d]] 09:35, 13 February 2023 (PST) |
|||
===== Dektak XT ready for training ===== |
|||
We have replaced the Dektak 6M with a new Dektak XT profilometer. The system is available for training, please [[Aidan_Hopkins|contact the tool supervisor]]. |
|||
// [[User:John d|John d]] 10:08, 7 February 2023 (PST) |
|||
===== Au Plating: UP===== |
|||
only the full 100mm wafer fixture is available at the moment. You can plate smaller pieces on it with no issues. |
|||
// [[User:Mehalana v|Vraj Mehalana]] 12:35, 15 March 2023 (PDT) |
|||
<!---------- end of Equipment Status ------------> |
|||
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
||
<endfeed /> |
<endfeed /> |
||
Latest revision as of 06:39, 3 December 2025
Christmas Lab Shutdown: Dec 22-25
Users, To perform annual maintenance, we are planning to have the lab shut down from 9 am on Monday December 22 through 9 am Friday December 26th.
Please plan accordingly. - Peder Lenvik // Demis D. John 02:03, 27 November 2025 (UTC)
Announcements moved
Please check the announcements in SignupMonkey for equipment notifications. // Demis D. John 02:03, 27 November 2025 (UTC)