=====Oxford Flexal ALD=====
=====Stepper #3 (ASML DUV) - Maintenance April 10th week=====
The PM is proceeding slower than expected. As such, I currently anticipate that the tool will be available for use by the end of the day on Friday.
ASML engineers will be performing periodic maintenance the week of April 10th.

Please plan for the system to be down ~10a Monday April 10th, until Friday that week.
Sorry for any inconvenience this may cause.
//[[User:Mehalana v|Vraj Mehalana]] 09:17, 4 April 2023 (PDT)

=====FEI SEM#1 Replacement Project=====
Thanks
The FEI SEM #1 will be removed and replaced starting Friday March 17th. Both SEMs will be shut down and the SEM room will be off limits beginning at 8 am Friday and return to normal operations Tuesday morning the 21st.
Bill Millerski
//[[User:Mehalana v|Vraj Mehalana]] 10:55, 16 March 2023 (PDT)
//[[User:Mehalana v|Vraj Mehalana]] 21:12, 12 August 2025 (UTC)
<!--feedBurner name="UCSBNanofab-Announcements" /-->

<!-- Description of the RSS feed -->
=====Suss SB6-8E=====
This tool is down indefinitely. We are sourcing manual bonding fixtures, and already have a 1cm bonding fixture for NanoFab users to use - please contact [[Demis D. John]] for more information.
// [[User:John_d|Demis D. John]] 04:28, 5 August 2025 (UTC)

=====ICP1 Down=====
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)

<!--
<!--
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Line 15: Line 23:
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
-->
-->
<!---------------------------------------------->
<!------------- Equipment Status ---------------->
===== Unaxis Etch: Down =====
We had to take the VAT controller off of this module to get the ICP-PECVD running. I have no immediate ETA for this system coming back online. Until we get this system running again you will need to use the Oxford Cobra system. -- Tony
// [[User:John d|John d]] 09:35, 13 February 2023 (PST)
===== Au Plating: UP=====
only the full 100mm wafer fixture is available at the moment. You can plate smaller pieces on it with no issues.
// [[User:Mehalana v|Vraj Mehalana]] 12:35, 15 March 2023 (PDT)
<!---------- end of Equipment Status ------------>
<!---------DO NOT EDIT BELOW THIS LINE----------->
<!---------DO NOT EDIT BELOW THIS LINE----------->
<endfeed />
<endfeed />

Latest revision as of 22:24, 13 August 2025

Oxford Flexal ALD

The PM is proceeding slower than expected. As such, I currently anticipate that the tool will be available for use by the end of the day on Friday.

Sorry for any inconvenience this may cause.

Thanks Bill Millerski //Vraj Mehalana 21:12, 12 August 2025 (UTC)

Suss SB6-8E

This tool is down indefinitely. We are sourcing manual bonding fixtures, and already have a 1cm bonding fixture for NanoFab users to use - please contact Demis D. John for more information. // Demis D. John 04:28, 5 August 2025 (UTC)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)