Template:Announcements: Difference between revisions
Jump to navigation
Jump to search
Content deleted Content added
Mehalana v (talk | contribs) Feed Appended |
deleted xmas shutdown |
||
| (329 intermediate revisions by 7 users not shown) | |||
| Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
=====Flip-Chip Bonder, (Finetech) - Update===== |
|||
Finetech is expected to be on-site at the end of next week. I'm sorry for the delay but that's the earliest they can get here. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 10:35, 3 May 2023 (PDT) |
|||
=====Plasma Activation (EVG 810)===== |
|||
We have received almost all the replacement parts for the tool except the new chuck. The original delivery date of mid June has now been pushed out to early September and they have stated that this is the best that their supplier can do. I will not be installing any new parts on the tool until we have everything. |
|||
=====Announcements moved===== |
|||
Runs will still require Staff supervision until then. |
|||
Please check the <u>[https://signupmonkey.ece.ucsb.edu announcements in SignupMonkey]</u> for equipment notifications. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 18:01, 2 May 2023 (PDT) |
|||
// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC) |
|||
=====E-Beam #4 (CHA) - EB4 is down===== |
|||
We need to replace a part on the source shutter. We should have it on Monday. I'll update when the tool is available. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 15:26, 28 April 2023 (PDT) |
|||
=====Wafer Coater (S Cubed Flexi) - S3 field service===== |
|||
S3 will be on-site looking into our hand 2 issues on Wednesday May 3rd and 4th. They will be confirming Monday so there is a chance those days get shifted. Please plan your processing accordingly as the system will not be available while they are here looking into the problem. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 13:54, 28 April 2023 (PDT) |
|||
=====FEI SEM#1 Replacement Project===== |
|||
The FEI SEM #1 will be removed and replaced starting Friday March 17th. Both SEMs will be shut down and the SEM room will be off limits beginning at 8 am Friday and return to normal operations Tuesday morning the 21st. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 10:55, 16 March 2023 (PDT) |
|||
<!--feedBurner name="UCSBNanofab-Announcements" /--> |
|||
<!-- Description of the RSS feed --> |
|||
<!-- |
<!-- |
||
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
| Line 25: | Line 11: | ||
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
--> |
--> |
||
<!----------------------------------------------> |
|||
<!------------- Equipment Status ----------------> |
|||
===== Unaxis Etch: Down ===== |
|||
We had to take the VAT controller off of this module to get the ICP-PECVD running. I have no immediate ETA for this system coming back online. Until we get this system running again you will need to use the Oxford Cobra system. -- Tony |
|||
// [[User:John d|John d]] 09:35, 13 February 2023 (PST) |
|||
===== Au Plating: UP===== |
|||
only the full 100mm wafer fixture is available at the moment. You can plate smaller pieces on it with no issues. |
|||
// [[User:Mehalana v|Vraj Mehalana]] 12:35, 15 March 2023 (PDT) |
|||
<!---------- end of Equipment Status ------------> |
|||
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
||
<endfeed /> |
<endfeed /> |
||
Latest revision as of 19:31, 5 February 2026
Announcements moved
Please check the announcements in SignupMonkey for equipment notifications. // Demis D. John 02:03, 27 November 2025 (UTC)