Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
No edit summary
(deleted ASML update)
 
(224 intermediate revisions by 7 users not shown)
Line 1: Line 1:
<startfeed />
<startfeed />

=====Unaxis ICP-PECVD is DOWN=====
=====Suss SB6-8E=====
I removed the wafer that was stuck in the process chamber. Once again it was user error. You MUST remove ALL of the resist from the outer 5-7mm of your wafer when processing with 100mm substrates.
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
Sadly the system is still down. I looked into the RF1 tuning issues and it looks as though it has failed completely. I tried replacing the AMT controller but the failure mode didn't change. I did notice that when I placed the AMT controller in Manual and tried to drive the caps the matching network was unresponsive. It looks like the matching network may need to be replaced.-Tony

//[[User:Mehalana v|Vraj Mehalana]] 09:25, 30 May 2023 (PDT)
-Aidan
=====IBD UP=====
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT)
We received the new Xe bottle, and it was installed, leak checked, and tested without issue.

IBD is back up and available for use.
=====ICP1 Down=====
I apologize for any inconvenience.
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
//[[User:Mehalana v|Vraj Mehalana]] 12:20, 25 May 2023 (PDT)
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
=====Plasma Activation (EVG 810)=====

We have received almost all the replacement parts for the tool except the new chuck. The original delivery date of mid June has now been pushed out to early September and they have stated that this is the best that their supplier can do. I will not be installing any new parts on the tool until we have everything.
=====Lab Access Changes: Symmetry App=====
Runs will still require Staff supervision until then.
The iris scanner has been decommissioned. Please use the card reader which supports:
//[[User:Mehalana v|Vraj Mehalana]] 18:01, 2 May 2023 (PDT)

-Physical card

-Mobile phone via Symmetry App

//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)


<!--
<!--
Line 20: Line 26:
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
-->
-->
<!---------------------------------------------->
<!------------- Equipment Status ---------------->


<!---------- end of Equipment Status ------------>
<!---------DO NOT EDIT BELOW THIS LINE----------->
<!---------DO NOT EDIT BELOW THIS LINE----------->
<endfeed />
<endfeed />

Latest revision as of 00:45, 7 November 2024

Suss SB6-8E

When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.

-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)