Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
Content deleted Content added
No edit summary
→Equipment Status: remove signature
 
(312 intermediate revisions by 6 users not shown)
Line 1: Line 1:
<startfeed />
<startfeed />
=====SEM 1 Update=====
Once SEM 1 is up we’ll wait for at least a week before we decommission SEM 2.
//[[User:Mehalana v|Vraj Mehalana]] 11:16, 12 July 2023 (PDT)


=====Plasma Activation (EVG 810)=====
=====Equipment Status=====
See the <u>[https://signupmonkey.ece.ucsb.edu SignupMonkey login page]</u> for equipment status messages.
We have received almost all the replacement parts for the tool except the new chuck. The original delivery date of mid June has now been pushed out to early September and they have stated that this is the best that their supplier can do. I will not be installing any new parts on the tool until we have everything.
Runs will still require Staff supervision until then.
//[[User:Mehalana v|Vraj Mehalana]] 18:01, 2 May 2023 (PDT)


<!--
<!--
Line 15: Line 10:
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
-->
-->
<!---------------------------------------------->
<!------------- Equipment Status ---------------->


<!---------- end of Equipment Status ------------>
<!---------DO NOT EDIT BELOW THIS LINE----------->
<!---------DO NOT EDIT BELOW THIS LINE----------->
<endfeed />
<endfeed />

Latest revision as of 23:46, 3 October 2026

Equipment Status

See the SignupMonkey login page for equipment status messages.