===== Raith EBL Update =====
=====Dicing Saw (ADT) Upgrade 10/9 - PLEASE READ
Raith replaced every item that was left to replace in the column on Monday. Yesterday they performed some quick tests @ 50kV and the issue with deflector settling was gone. This is an extremely positive result! It almost certainly suggests that the issue has been repaired. However, tests @ 100 kV remain to confirm the behavior and we are doing so later today and early tomorrow morning.
=====
The dicing saw is scheduled go down for an upgrade on Monday October 9th and will be down for that week and into the weekend. Part of the upgrade will be updated software and will require users to be re-trained. I will provide more info on the re-training once I get a little hands on time with the updated software.


I'll send out a couple of reminder emails between now and then and keep everyone updated in the event the schedule for this changes.
I am pretty confident that we are going to have a fully functional EBL system available for use early next week!
//[[User:Mehalana v|Vraj Mehalana]] 10:33, 6 September 2023 (PDT)
-Bill
=====Stepper #1 (GCA 6300) Scheduled Maintenance=====
// [[User:John_d|Demis D. John]] 17:42, 5 June 2025 (UTC)
The tool has been scheduled for maintenance on 9-28-23 from 8:00am to 5:00pm. During this time the tool will be unavailable for use. Please plan your lab activities accordingly.


===== SignupMonkey + Wiki: Off-Campus Access=====
//[[User:Mehalana v|Vraj Mehalana]] 10:13, 6 September 2023 (PDT)
Due to a DDoS attack affecting the Signupmonkey server, we have restricted access to the website to US locations only, including both the Nanofab Wiki and Signupmonkey.
=====SEM 2 is Up=====
JEOL has finished will the install and the SEM is available to use if you've received training on SEM #1.
[[User:Hopkins a|Hopkins a]] 15:32, 29 August 2023 (PDT)


If you are off-campus and experiencing issues, please utilize the UCSB VPN to access our sites. Here are the installation instructions for VPN on your device. You will need your UCSB NetID for download and installation - you would have received a UCSB NetID when you started using the NanoFab:
=====Plasma Activation (EVG 810)=====

We have received almost all the replacement parts for the tool except the new chuck. The original delivery date of mid June has now been pushed out to early September and they have stated that this is the best that their supplier can do. I will not be installing any new parts on the tool until we have everything.
https://it.ucsb.edu/ivanti-secure-access-campus-vpn/get-connected-campus-vpn
Runs will still require Staff supervision until then.

//[[User:Mehalana v|Vraj Mehalana]] 18:01, 2 May 2023 (PDT)
-- Vraj
// [[User:John_d|Demis D. John]] 20:08, 22 April 2025 (UTC)

=====Suss SB6-8E=====
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests.

I will send out an update once we have one.
-Aidan
// [[User:John_d|Demis D. John]] 00:35, 8 December 2024 (UTC)

=====ICP1 Down=====
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)


<!--
<!--
Line 25: Line 35:
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
-->
-->
<!---------------------------------------------->
<!------------- Equipment Status ---------------->


<!---------- end of Equipment Status ------------>
<!---------DO NOT EDIT BELOW THIS LINE----------->
<!---------DO NOT EDIT BELOW THIS LINE----------->
<endfeed />
<endfeed />

Latest revision as of 17:43, 5 June 2025

Raith EBL Update

Raith replaced every item that was left to replace in the column on Monday. Yesterday they performed some quick tests @ 50kV and the issue with deflector settling was gone. This is an extremely positive result! It almost certainly suggests that the issue has been repaired. However, tests @ 100 kV remain to confirm the behavior and we are doing so later today and early tomorrow morning.


I am pretty confident that we are going to have a fully functional EBL system available for use early next week! -Bill // Demis D. John 17:42, 5 June 2025 (UTC)

SignupMonkey + Wiki: Off-Campus Access

Due to a DDoS attack affecting the Signupmonkey server, we have restricted access to the website to US locations only, including both the Nanofab Wiki and Signupmonkey.

If you are off-campus and experiencing issues, please utilize the UCSB VPN to access our sites. Here are the installation instructions for VPN on your device. You will need your UCSB NetID for download and installation - you would have received a UCSB NetID when you started using the NanoFab:

https://it.ucsb.edu/ivanti-secure-access-campus-vpn/get-connected-campus-vpn

-- Vraj // Demis D. John 20:08, 22 April 2025 (UTC)

Suss SB6-8E

We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests.

I will send out an update once we have one. -Aidan // Demis D. John 00:35, 8 December 2024 (UTC)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)