Template:Announcements: Difference between revisions
Jump to navigation
Jump to search
Content deleted Content added
Mehalana v (talk | contribs) Feed Appended |
mNo edit summary |
||
| (288 intermediate revisions by 5 users not shown) | |||
| Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
=====Unaxis ICP-PECVD is DOWN===== |
|||
RF1 continues to be a problem. I will start the process of elimination from a hardware point of view Monday. Once I resolve the hardware issue our Process group will be exclusively running the system for about a week. During this time we will NOT be allowing anyone else to use the system. Sorry for the inconvenience. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 22 September 2023 (PDT) |
|||
=====Wafer Bonder, (Suss SB6-8E)===== |
|||
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update. |
|||
=====Christmas Lab Shutdown: Dec 22-25===== |
|||
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT) |
|||
Users, |
|||
To perform annual maintenance, we are planning to have the lab shut down from '''''9 am on Monday December 22 through 9 am Friday December 26th'''''. |
|||
Please plan accordingly. |
|||
=====Dicing Saw (ADT) Upgrade 10/9===== |
|||
- Peder Lenvik |
|||
The dicing saw is scheduled go down for an upgrade on Monday October 9th and will be down for that week and into the weekend. Part of the upgrade will be updated software and will require users to be re-trained. I will provide more info on the re-training once I get a little hands on time with the updated software. |
|||
// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC) |
|||
I'll send out a couple of reminder emails between now and then and keep everyone updated in the event the schedule for this changes. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 10:33, 6 September 2023 (PDT) |
|||
=====Announcements moved===== |
|||
=====Stepper #1 (GCA 6300) Scheduled Maintenance===== |
|||
Please check the announcements in SignupMonkey for equipment notifications. |
|||
The tool has been scheduled for maintenance on 9-28-23 from 8:00am to 5:00pm. During this time the tool will be unavailable for use. Please plan your lab activities accordingly. |
|||
//[[User: |
// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC) |
||
=====EVG is up===== |
|||
The work on the tool has been completed and it is available for use without Staff supervision. We made 30 runs on the tool without any high reflected power issues, but the possibility still remains that it could happen. System available for use. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:16, 22 September 2023 (PDT) |
|||
<!-- |
<!-- |
||
| Line 27: | Line 19: | ||
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
--> |
--> |
||
<!----------------------------------------------> |
|||
<!------------- Equipment Status ----------------> |
|||
<!---------- end of Equipment Status ------------> |
|||
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
||
<endfeed /> |
<endfeed /> |
||
Latest revision as of 06:39, 3 December 2025
Christmas Lab Shutdown: Dec 22-25
Users, To perform annual maintenance, we are planning to have the lab shut down from 9 am on Monday December 22 through 9 am Friday December 26th.
Please plan accordingly. - Peder Lenvik // Demis D. John 02:03, 27 November 2025 (UTC)
Announcements moved
Please check the announcements in SignupMonkey for equipment notifications. // Demis D. John 02:03, 27 November 2025 (UTC)