Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
 
(191 intermediate revisions by 5 users not shown)
Line 1: Line 1:
<startfeed />
<startfeed />
=====Unaxis ICP-PECVD is DOWN=====
RF1 continues to be a problem. I will start the process of elimination from a hardware point of view Monday. Once I resolve the hardware issue our Process group will be exclusively running the system for about a week. During this time we will NOT be allowing anyone else to use the system. Sorry for the inconvenience.
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 22 September 2023 (PDT)


=====Wafer Bonder, (Suss SB6-8E)=====
=====Lab Shutdown: Dec 26 to Jan 3rd=====
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)


We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed.
=====Dicing Saw (ADT) Upgrade 10/9=====
The dicing saw is scheduled go down for an upgrade on Monday October 9th and will be down for that week and into the weekend. Part of the upgrade will be updated software and will require users to be re-trained. I will provide more info on the re-training once I get a little hands on time with the updated software.
I'll send out a couple of reminder emails between now and then and keep everyone updated in the event the schedule for this changes.
//[[User:Mehalana v|Vraj Mehalana]] 10:33, 6 September 2023 (PDT)


During the shutdown this year we will be pulling all cleanroom suits and stocking new suits.
=====Stepper #1 (GCA 6300) Scheduled Maintenance=====
The scheduled maintenance activates on 9-28-23 have been cancelled and will be rescheduled at a later date. The tool is now available to be reserved for use on that date.
//[[User:Mehalana v|Vraj Mehalana]] 10:29, 26 September 2023 (PDT)


PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH
=====Stepper #2 (GCA Autostep 200) - Scheduled Maintenance=====
The Autostep 200 will be undergoing maintenance and will be unavailable on the following dates and times:
(1) 09-30-23 8:00am-5:00pm
(2) 10-01-23 8:00am-5:00pm
(3) 10-02-23 8:00am-12:00pm
Please plan your work activities accordingly.
//[[User:Mehalana v|Vraj Mehalana]] 13:49, 27 September 2023 (PDT)


//[[User:John_d|Demis D. John]] 16:55, 24 November 2024 (UTC)
===== EVG is down=====

I went to check the tool out this morning and found it was not pumping down properly. After further inspection of the tool I found that the lid's quartz liner has cracked. Contacting EVG but the tool will probably be down for some time. I will updated everyone once I have an estimated down time.
=====New Gowns in Jan=====
//[[User:Mehalana v|Vraj Mehalana]] 11:39, 25 September 2023 (PDT)
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use.
// [[User:John_d|Demis D. John]] 16:58, 24 November 2024 (UTC)

=====Suss SB6-8E=====
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.

-Aidan
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT)

=====ICP1 Down=====
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)

=====Lab Access Changes: Symmetry App=====
The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)


<!--
<!--
Line 35: Line 40:
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
-->
-->
<!---------------------------------------------->
<!------------- Equipment Status ---------------->


<!---------- end of Equipment Status ------------>
<!---------DO NOT EDIT BELOW THIS LINE----------->
<!---------DO NOT EDIT BELOW THIS LINE----------->
<endfeed />
<endfeed />

Latest revision as of 16:58, 24 November 2024

Lab Shutdown: Dec 26 to Jan 3rd

We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed.

During the shutdown this year we will be pulling all cleanroom suits and stocking new suits.

PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH

//Demis D. John 16:55, 24 November 2024 (UTC)

New Gowns in Jan

We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. // Demis D. John 16:58, 24 November 2024 (UTC)

Suss SB6-8E

When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.

-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)