=====Lab is OPEN===== |
||
We completed our work early and the lab is now open for use. |
|||
PECVD2 will be going down on Thursday October 19th for replacement of the hoist. |
|||
-- Tony |
|||
//[[User:John_d|Demis D. John]] 22:23, 10 February 2025 (UTC) |
|||
This will be an all day event starting at 8:00am. |
|||
=====Olympus DSX Microscope: Down===== |
|||
⚫ | |||
After speaking with Olympus it looks like there is a problem with the polarizer that is interfering with basic system initialization. I'm waiting for the repair quote and will update everyone when we know more. |
|||
-- Tony Bosch |
|||
// [[User:John_d|Demis D. John]] 20:41, 5 February 2025 (UTC) |
|||
=====Stepper #3 (ASML DUV) - Maint moved to March 3rd===== |
|||
This was originally planned for 10-2, but we had to reschedule due to other equipment down |
|||
We have postponed the Periodic Maintenance (PM) to the week of Monday March 3rd. |
|||
⚫ | |||
⚫ | |||
=====Raith Velion - Velion repair - status update===== |
|||
// [[User:John_d|Demis D. John]] 19:44, 4 February 2025 (UTC) |
|||
The new stage motor is now onsite and a Raith field service engineer will install it on Wednesday. I expect the tool will be returned to users on Friday, I'll update again if anything changes. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 12:17, 11 October 2023 (PDT) |
|||
=====Unaxis ICP-PECVD is UP for Non-GapFill===== |
|||
Tool is up for NON-GapFill (450W RF Bias) Recipes. Other Std SiO2/SiN deps are available. |
|||
Next Week Monday Oct 16th to Wed 18th we will allow GapFill (450W RF Bias) recipes to be run. |
|||
Please plan your process accordingly. |
|||
Also we are still testing our own GapFill recipe that hopefully reduces flakes. Once this is ready you’ll want to qualify our new recipe to make sure it works for your application, as the old GapFill recipe will eventually be deprecated & disallowed. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 09:55, 11 October 2023 (PDT) |
|||
===== |
=====ICP #2 Maint: Complete===== |
||
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT) |
|||
The maintenance is completed and the tool is finishing up an O2 clean run. We are still seeing a 0.04-0.05 Pa actual pressure difference in the software (as before the maint work) which we will address tomorrow, as the tool needs time to reach base pressure. -- Lee Sawyer |
|||
=====Dicing Saw (ADT) Upgrade 10/9===== |
|||
The dicing saw is scheduled go down for an upgrade on Monday October 9th and will be down for that week and into the weekend. Part of the upgrade will be updated software and will require users to be re-trained. I will provide more info on the re-training once I get a little hands on time with the updated software. |
|||
ADT will be able to transfer your recipes from the GUI software to the NUI software. Please note that we do sometimes run into an issue with a recipe, as it is not a 100% perfect process, but the vast majority of the recipes do transfer over. If there are any you are concerned about, please make sure you have all parameters documented prior to us upgrading the machine. |
|||
Documentation of recipes is the user's responsibility, Staff will not be taking care of this. |
|||
-Lee |
|||
//[[User:Mehalana v|Vraj Mehalana]] 13:25, 3 October 2023 (PDT) |
|||
=====Stepper #1 (GCA 6300) Scheduled Maintenance===== |
|||
The scheduled maintenance activates on 9-28-23 have been cancelled and will be rescheduled at a later date. The tool is now available to be reserved for use on that date. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 10:29, 26 September 2023 (PDT) |
|||
//[[User:John_d|Demis D. John]] 02:01, 5 February 2025 (UTC) |
|||
=====Stepper #2 (GCA Autostep 200) - Scheduled Maintenance===== |
|||
The Autostep 200 will be undergoing maintenance and will be unavailable on the following dates and times: |
|||
=====Oxford ALD+Ion Mill: UP===== |
|||
(1) 09-30-23 8:00am-5:00pm |
|||
The tool is useable and in its original condition. If you had a reservation under the previous tool designation it has already been moved over for you. |
|||
(2) 10-01-23 8:00am-5:00pm |
|||
(3) 10-02-23 8:00am-12:00pm |
|||
Chamber 1 is operational and available for use. However, only recipes that run at 300C are to be ran on the tool, as the current thermocouple is only calibrated for that temperature at this time. |
|||
Please plan your work activities accordingly. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 13:49, 27 September 2023 (PDT) |
|||
Please use the original tool name on SUM to make all future tool reservations. |
|||
There is no longer a need for supplemental training. If you have been previously trained on the tool but not received the supplemental training, you can once again reserve and use the tool. |
|||
Please feel free to email me directly with any questions you may have. |
|||
Thanks |
|||
Bill Millerski |
|||
UCSB |
|||
//[[User:John_d|Demis D. John]] 19:48, 4 February 2025 (UTC) |
|||
=====New Gowns: Toolbelts purchases===== |
|||
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase. |
|||
Two vendors for cleanroom belts we are using are listed here, you may request others: |
|||
* [https://www.terrauniversal.com/tool-belt-pocket-49in-waist-white-altessa-grid-uniform-technology-4954-60a.html Uniform Technology Tool Belt] - note the waist size, the 49” belt fits up to ~36-38” waist. |
|||
* [https://www.fishersci.com/shop/products/cleanroom-fannypack-1-ea-white/NC0723118?searchHijack=true&searchTerm=cleanroom-fannypack-1-ea-white&searchType=Rapid&matchedCatNo=NC0723118 HiTEC Fannypack] |
|||
// [[User:John_d|Demis D. John]] 03:34, 3 January 2025 (UTC) |
|||
⚫ | |||
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests. |
|||
I will send out an update once we have one. |
|||
-Aidan |
|||
// [[User:John_d|Demis D. John]] 00:35, 8 December 2024 (UTC) |
|||
=====ICP1 Down===== |
|||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
⚫ | |||
⚫ | |||
We have received the part to repair the tool but we are still consulting with EVG as to who will be preforming the repair work. We hope to have a better handle on this early next week and will update everyone at that time. -Lee |
|||
//[[User:Mehalana v|Vraj Mehalana]] 10:51, 29 September 2023 (PDT) |
|||
<!-- |
<!-- |
||
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
Line 50: | Line 64: | ||
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
--> |
--> |
||
<!----------------------------------------------> |
|||
<!------------- Equipment Status ----------------> |
|||
<!---------- end of Equipment Status ------------> |
|||
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
||
<endfeed /> |
<endfeed /> |
Latest revision as of 22:23, 10 February 2025
Lab is OPEN
We completed our work early and the lab is now open for use. -- Tony
//Demis D. John 22:23, 10 February 2025 (UTC)
Olympus DSX Microscope: Down
After speaking with Olympus it looks like there is a problem with the polarizer that is interfering with basic system initialization. I'm waiting for the repair quote and will update everyone when we know more. -- Tony Bosch // Demis D. John 20:41, 5 February 2025 (UTC)
Stepper #3 (ASML DUV) - Maint moved to March 3rd
We have postponed the Periodic Maintenance (PM) to the week of Monday March 3rd. Please plan your work accordingly. // Demis D. John 19:44, 4 February 2025 (UTC)
ICP #2 Maint: Complete
The maintenance is completed and the tool is finishing up an O2 clean run. We are still seeing a 0.04-0.05 Pa actual pressure difference in the software (as before the maint work) which we will address tomorrow, as the tool needs time to reach base pressure. -- Lee Sawyer
//Demis D. John 02:01, 5 February 2025 (UTC)
Oxford ALD+Ion Mill: UP
The tool is useable and in its original condition. If you had a reservation under the previous tool designation it has already been moved over for you.
Chamber 1 is operational and available for use. However, only recipes that run at 300C are to be ran on the tool, as the current thermocouple is only calibrated for that temperature at this time.
Please use the original tool name on SUM to make all future tool reservations.
There is no longer a need for supplemental training. If you have been previously trained on the tool but not received the supplemental training, you can once again reserve and use the tool.
Please feel free to email me directly with any questions you may have.
Thanks Bill Millerski UCSB //Demis D. John 19:48, 4 February 2025 (UTC)
New Gowns: Toolbelts purchases
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase.
Two vendors for cleanroom belts we are using are listed here, you may request others:
- Uniform Technology Tool Belt - note the waist size, the 49” belt fits up to ~36-38” waist.
- HiTEC Fannypack
// Demis D. John 03:34, 3 January 2025 (UTC)
Suss SB6-8E
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests.
I will send out an update once we have one. -Aidan // Demis D. John 00:35, 8 December 2024 (UTC)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)