Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
Content deleted Content added
mNo edit summary
 
(261 intermediate revisions by 5 users not shown)
Line 1: Line 1:
<startfeed />
<startfeed />


=====EBeam2 UP=====
=====Christmas Lab Shutdown: Dec 22-25=====
Users,
Test run completed without issue. System is ready to use, EXCEPT for heater - contact supervisor for heater use. See email for updates to operating procedure.
To perform annual maintenance, we are planning to have the lab shut down from '''''9 am on Monday December 22 through 9 am Friday December 26th'''''.


Please plan accordingly.
//[[User:Mehalana v|Vraj Mehalana]] 11:48, 26 October 2023 (PDT)
- Peder Lenvik
=====ProbeStation scheduled IT maintenance=====
// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC)
The ProbeStation will be undergoing IT maintenance and will be unavailable on the following dates :
* 10-30-23
* 10-31-23
Please plan your work activities accordingly.


=====Announcements moved=====
//[[User:Mehalana v|Vraj Mehalana]] 11:58, 17 October 2023 (PDT)
Please check the announcements in SignupMonkey for equipment notifications.
// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC)


=====PECVD2 is UP=====
Initially it was planned to remove the hoist again to rebuild it to solve the leak.

The manufacturer is sending out a rebuild kit under warranty since it is a brand new hoist that is leaking.
When that arrives I will schedule another all day event to rebuild the hoist.

I cleaned up the leaked oil, checked oil level, and did an inspection of the tool.
System is back up and available for use.

//[[User:Mehalana v|Vraj Mehalana]] 11:11, 23 October 2023 (PDT)
=====Unaxis VLR - GapFill allowed Mon 30th 5pm to Wed 6am=====
We are still working on an improved GapFill recipe.

To allow your processes through, on Monday EVENING at 5pm we will allow the old "450W GapFill" recipe to be run,

- starting Monday Oct 30th, evening at 5pm,

- ending Wed Nov 1st, morning at 6am.

Reminder: You may NOT run the 450W recipe outside these allowed times, and you may Not modify our recipes apart from Dep/Clean TIME.

Let me know if you have any questions.

//[[User:Mehalana v|Vraj Mehalana]] 09:55, 11 October 2023 (PDT)

=====Wafer Bonder, (Suss SB6-8E)=====
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.

//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)

=====EVG Activation: Up=====
The FSE has completed the work on the tool and I have made several test runs without issue.

IMPORTANT - Please see corresponding email for changes in operation.

//[[User:Mehalana v|Vraj Mehalana]] 15:58, 24 October 2023 (PDT)
<!--
<!--
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Line 55: Line 19:
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
-->
-->
<!---------------------------------------------->
<!------------- Equipment Status ---------------->


<!---------- end of Equipment Status ------------>
<!---------DO NOT EDIT BELOW THIS LINE----------->
<!---------DO NOT EDIT BELOW THIS LINE----------->
<endfeed />
<endfeed />

Latest revision as of 06:39, 3 December 2025

Christmas Lab Shutdown: Dec 22-25

Users, To perform annual maintenance, we are planning to have the lab shut down from 9 am on Monday December 22 through 9 am Friday December 26th.

Please plan accordingly. - Peder Lenvik // Demis D. John 02:03, 27 November 2025 (UTC)

Announcements moved

Please check the announcements in SignupMonkey for equipment notifications. // Demis D. John 02:03, 27 November 2025 (UTC)