Difference between revisions of "Template:Announcements"
Mehalana v (talk | contribs) |
Mehalana v (talk | contribs) |
||
(95 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
− | ===== |
+ | =====MA6 is up===== |
+ | JEOL Service will be here tomorrow morning to look at the situation. They had me try a couple of things today that didn't work. It is pointing to a gun replacement at this point. They do a have a spare gun at the JEOL facility in Pittsburgh ready to go if needed. |
||
− | The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
||
⚫ | |||
⚫ | |||
⚫ | |||
− | Test run completed without issue. System is ready to use, EXCEPT for heater - contact supervisor for heater use. See email for updates to operating procedure. |
||
+ | =====(JEOL JBX-6300FS) System is UP===== |
||
− | //[[User:Mehalana v|Vraj Mehalana]] 11:48, 26 October 2023 (PDT) |
||
− | =====ProbeStation scheduled IT maintenance===== |
||
− | The probe station is up, only the computer is down. Standard electrical probe measurements are still available, just not automated plotting |
||
− | //[[User:Mehalana v|Vraj Mehalana]] 14:29, 3 November 2023 (PDT) |
||
⚫ | |||
− | =====PECVD2 is down===== |
||
− | We were able to fix the vacuum leak but unfortunately the particulates are off the chart and rate is still a bit low. Tomorrow morning we will be taking the showerhead apart and cleaning it up before testing again. |
||
⚫ | |||
+ | =====MLA Maintenance 6/24-6/27===== |
||
− | =====Unaxis VLR - GapFill allowed Mon 30th 5pm to Wed 6am===== |
||
+ | The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the |
||
− | We are still working on an improved GapFill recipe. |
||
+ | evenings. |
||
+ | -Lee |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
||
− | To allow your processes through, on Monday EVENING at 5pm we will allow the old "450W GapFill" recipe to be run, |
||
+ | =====Stepper #1 (GCA 6300) - Tool availability===== |
||
− | - starting Monday Oct 30th, evening at 5pm, |
||
+ | Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times: |
||
+ | 6-18-24 at 8:00am |
||
− | - ending Wed Nov 1st, morning at 6am. |
||
+ | Till |
||
+ | 6-20-24 at 5:00pm |
||
+ | Please plan your processing activities accordingly. |
||
− | Reminder: You may NOT run the 450W recipe outside these allowed times, and you may Not modify our recipes apart from Dep/Clean TIME. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
||
+ | =====Stepper #2 (GCA Autostep 200) - Tool availability===== |
||
− | Let me know if you have any questions. |
||
+ | Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times: |
||
+ | 6-21-24 at 8:00am |
||
− | //[[User:Mehalana v|Vraj Mehalana]] 09:55, 11 October 2023 (PDT) |
||
+ | Till |
||
+ | 6-21-24 at 5:00pm |
||
+ | Please plan your processing activities accordingly. |
||
⚫ | |||
− | The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update. |
||
+ | Thanks |
||
⚫ | |||
+ | Bill Millerski |
||
+ | UCSB |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
||
− | ===== |
+ | =====Velion FIB Tool DOWN===== |
+ | Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice. |
||
− | The FSE has completed the work on the tool and I have made several test runs without issue. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT) |
||
− | IMPORTANT - Please see corresponding email for changes in operation. |
||
+ | |||
⚫ | |||
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
||
+ | |||
+ | =====Lab Access Changes: Symmetry App===== |
||
+ | The iris scanner has been decommissioned. Please use the card reader which supports: |
||
+ | |||
+ | -Physical card |
||
+ | |||
+ | -Mobile phone via Symmetry App |
||
+ | |||
+ | //[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
||
+ | |||
⚫ | |||
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
||
⚫ | |||
⚫ | |||
<!-- |
<!-- |
||
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
Line 49: | Line 69: | ||
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
--> |
--> |
||
− | <!----------------------------------------------> |
||
− | <!------------- Equipment Status ----------------> |
||
− | |||
− | |||
− | <!---------- end of Equipment Status ------------> |
||
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
||
<endfeed /> |
<endfeed /> |
Latest revision as of 17:01, 14 June 2024
MA6 is up
JEOL Service will be here tomorrow morning to look at the situation. They had me try a couple of things today that didn't work. It is pointing to a gun replacement at this point. They do a have a spare gun at the JEOL facility in Pittsburgh ready to go if needed.
//Vraj Mehalana 16:59, 14 June 2024 (PDT)
(JEOL JBX-6300FS) System is UP
//Vraj Mehalana 16:59, 14 June 2024 (PDT)
MLA Maintenance 6/24-6/27
The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the evenings. -Lee //Vraj Mehalana 16:59, 14 June 2024 (PDT)
Stepper #1 (GCA 6300) - Tool availability
Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times:
6-18-24 at 8:00am Till 6-20-24 at 5:00pm
Please plan your processing activities accordingly. //Vraj Mehalana 16:59, 14 June 2024 (PDT)
Stepper #2 (GCA Autostep 200) - Tool availability
Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times:
6-21-24 at 8:00am Till 6-21-24 at 5:00pm
Please plan your processing activities accordingly.
Thanks Bill Millerski UCSB //Vraj Mehalana 16:59, 14 June 2024 (PDT)
Velion FIB Tool DOWN
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
//Vraj Mehalana 10:58, 30 April 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)