=====Job Opening: Process Engineer=====
+
=====MA6 is up=====
  +
JEOL Service will be here tomorrow morning to look at the situation. They had me try a couple of things today that didn't work. It is pointing to a gun replacement at this point. They do a have a spare gun at the JEOL facility in Pittsburgh ready to go if needed.
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT)
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
=====EBeam2 UP=====
 
Test run completed without issue. System is ready to use, EXCEPT for heater - contact supervisor for heater use. See email for updates to operating procedure.
 
   
  +
=====(JEOL JBX-6300FS) System is UP=====
//[[User:Mehalana v|Vraj Mehalana]] 11:48, 26 October 2023 (PDT)
 
=====ProbeStation scheduled IT maintenance=====
 
The probe station is up, only the computer is down. Standard electrical probe measurements are still available, just not automated plotting
 
//[[User:Mehalana v|Vraj Mehalana]] 14:29, 3 November 2023 (PDT)
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
=====PECVD2 is down=====
 
We were able to fix the vacuum leak but unfortunately the particulates are off the chart and rate is still a bit low. Tomorrow morning we will be taking the showerhead apart and cleaning it up before testing again.
 
//[[User:Mehalana v|Vraj Mehalana]] 16:48, 31 October 2023 (PDT)
 
   
  +
=====MLA Maintenance 6/24-6/27=====
=====Unaxis VLR - GapFill allowed Mon 30th 5pm to Wed 6am=====
 
  +
The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the
We are still working on an improved GapFill recipe.
 
  +
evenings.
  +
-Lee
  +
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
   
To allow your processes through, on Monday EVENING at 5pm we will allow the old "450W GapFill" recipe to be run,
 
   
  +
=====Stepper #1 (GCA 6300) - Tool availability=====
- starting Monday Oct 30th, evening at 5pm,
 
  +
Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times:
   
  +
6-18-24 at 8:00am
- ending Wed Nov 1st, morning at 6am.
 
  +
Till
  +
6-20-24 at 5:00pm
   
  +
Please plan your processing activities accordingly.
Reminder: You may NOT run the 450W recipe outside these allowed times, and you may Not modify our recipes apart from Dep/Clean TIME.
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
   
  +
=====Stepper #2 (GCA Autostep 200) - Tool availability=====
Let me know if you have any questions.
 
  +
Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times:
   
  +
6-21-24 at 8:00am
//[[User:Mehalana v|Vraj Mehalana]] 09:55, 11 October 2023 (PDT)
 
  +
Till
  +
6-21-24 at 5:00pm
   
  +
Please plan your processing activities accordingly.
=====Wafer Bonder, (Suss SB6-8E)=====
 
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.
 
   
  +
Thanks
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)
 
  +
Bill Millerski
  +
UCSB
  +
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
   
=====EVG Activation: Up=====
+
=====Velion FIB Tool DOWN=====
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
The FSE has completed the work on the tool and I have made several test runs without issue.
 
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
IMPORTANT - Please see corresponding email for changes in operation.
 
  +
 
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
  +
  +
=====Lab Access Changes: Symmetry App=====
  +
The iris scanner has been decommissioned. Please use the card reader which supports:
  +
  +
-Physical card
  +
  +
-Mobile phone via Symmetry App
  +
  +
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
  +
 
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   
//[[User:Mehalana v|Vraj Mehalana]] 15:58, 24 October 2023 (PDT)
 
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Line 49: Line 69:
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
 
 
<!---------- end of Equipment Status ------------>
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />

Latest revision as of 17:01, 14 June 2024

MA6 is up

JEOL Service will be here tomorrow morning to look at the situation. They had me try a couple of things today that didn't work. It is pointing to a gun replacement at this point. They do a have a spare gun at the JEOL facility in Pittsburgh ready to go if needed.

//Vraj Mehalana 16:59, 14 June 2024 (PDT)

(JEOL JBX-6300FS) System is UP

//Vraj Mehalana 16:59, 14 June 2024 (PDT)

MLA Maintenance 6/24-6/27

The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the evenings. -Lee //Vraj Mehalana 16:59, 14 June 2024 (PDT)


Stepper #1 (GCA 6300) - Tool availability

Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times:

6-18-24 at 8:00am Till 6-20-24 at 5:00pm

Please plan your processing activities accordingly. //Vraj Mehalana 16:59, 14 June 2024 (PDT)

Stepper #2 (GCA Autostep 200) - Tool availability

Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times:

6-21-24 at 8:00am Till 6-21-24 at 5:00pm

Please plan your processing activities accordingly.

Thanks Bill Millerski UCSB //Vraj Mehalana 16:59, 14 June 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)