Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
Content deleted Content added
No edit summary
mNo edit summary
 
(245 intermediate revisions by 4 users not shown)
Line 1: Line 1:
<startfeed />
<startfeed />
=====Year End Shutdown=====
We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm.
//[[User:Mehalana v|Vraj Mehalana]] 15:13, 5 December 2023 (PST)
The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd.


=====Christmas Lab Shutdown: Dec 22-25=====
//[[User:Mehalana v|Vraj Mehalana]] 14:39, 16 November 2023 (PST)
Users,
To perform annual maintenance, we are planning to have the lab shut down from '''''9 am on Monday December 22 through 9 am Friday December 26th'''''.


Please plan accordingly.
=====PECVD2 is up for SiO2 and Std SiN Only=====
- Peder Lenvik
We have adjusted recipes for SiO2 and Std SiN. These are available for use. Read the emails first.
// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC)
Low Stress SiN and a-Si are not yet adjusted and are not ready for use. We hope to have these done the week of 11/20


=====Announcements moved=====
// [[User:Thibeault|Thibeault]] 09:10, 16 November 2023 (PST)
Please check the announcements in SignupMonkey for equipment notifications.
// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC)


=====Job Opening: Process Engineer=====
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.

//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT)

=====Lab Access Changes: Symmetry App=====
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.

// [[User:John d|John d]] 13:49, 7 November 2023 (PST)

=====Wafer Bonder, (Suss SB6-8E)=====
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.

//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)
<!--
<!--
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.

Latest revision as of 06:39, 3 December 2025

Christmas Lab Shutdown: Dec 22-25

Users, To perform annual maintenance, we are planning to have the lab shut down from 9 am on Monday December 22 through 9 am Friday December 26th.

Please plan accordingly. - Peder Lenvik // Demis D. John 02:03, 27 November 2025 (UTC)

Announcements moved

Please check the announcements in SignupMonkey for equipment notifications. // Demis D. John 02:03, 27 November 2025 (UTC)