=====DUV is down - Update=====
contacted our vendor for an update and was told that the parts should ship by this Friday. If all goes well the tool should be up mid next week.


=====Christmas Lab Shutdown: Dec 22-25=====
//[[User:Mehalana v|Vraj Mehalana]] 14:07, 13 December 2023 (PST)
Users,
To perform annual maintenance, we are planning to have the lab shut down from '''''9 am on Monday December 22 through 9 am Friday December 26th'''''.


Please plan accordingly.
=====PECVD2 Planned Down Time for Maintenance 12-11-23=====
- Peder Lenvik
PECVD2 will be going down on Monday 12-11-23 at 10:00am for replacement of the RF connector and RF Electrode.
// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC)


=====Announcements moved=====
When the work is complete, the process group will be running tests for the remainder of the afternoon.
Please check the announcements in SignupMonkey for equipment notifications.
// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC)


//[[User:Mehalana v|Vraj Mehalana]] 14:07, 13 December 2023 (PST)
=====Year End Shutdown=====
We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm.
The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd.

//[[User:Mehalana v|Vraj Mehalana]] 14:39, 16 November 2023 (PST)

=====PECVD2 is up for SiO2 and Std SiN Only=====
We have adjusted recipes for SiO2 and Std SiN. These are available for use. Read the emails first.
Low Stress SiN and a-Si are not yet adjusted and are not ready for use. We hope to have these done the week of 11/20

// [[User:Thibeault|Thibeault]] 09:10, 16 November 2023 (PST)

=====Job Opening: Process Engineer=====
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.

//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT)

=====Lab Access Changes: Symmetry App=====
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.

// [[User:John d|John d]] 13:49, 7 November 2023 (PST)

=====Wafer Bonder, (Suss SB6-8E)=====
SUSS now aims to be on site in early February. I’ll will send out an email once I get confirmation for a specific date.
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
<!--
<!--
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.

Latest revision as of 06:39, 3 December 2025

Christmas Lab Shutdown: Dec 22-25

Users, To perform annual maintenance, we are planning to have the lab shut down from 9 am on Monday December 22 through 9 am Friday December 26th.

Please plan accordingly. - Peder Lenvik // Demis D. John 02:03, 27 November 2025 (UTC)