=====Lab is OPEN===== |
||
We completed our work early and the lab is now open for use. |
|||
I am fairly certain the heater controller has failed. I have spoken with the vendor and they are looking into it, but we will most likely have to send the unit in. I will push to have a replacement controller sent instead, but since this is a warranty repair they will probably want to eval it in-house. I would plan for it to be down for at least a couple of weeks. I'll send out an update once I have more info. |
|||
-- Tony |
|||
//[[User: |
//[[User:John_d|Demis D. John]] 22:23, 10 February 2025 (UTC) |
||
===== |
=====Olympus DSX Microscope: Down===== |
||
After speaking with Olympus it looks like there is a problem with the polarizer that is interfering with basic system initialization. I'm waiting for the repair quote and will update everyone when we know more. |
|||
contacted our vendor for an update and was told that the parts should ship by this Friday. If all goes well the tool should be up mid next week. |
|||
-- Tony Bosch |
|||
// [[User:John_d|Demis D. John]] 20:41, 5 February 2025 (UTC) |
|||
=====Stepper #3 (ASML DUV) - Maint moved to March 3rd===== |
|||
⚫ | |||
We have postponed the Periodic Maintenance (PM) to the week of Monday March 3rd. |
|||
Please plan your work accordingly. |
|||
// [[User:John_d|Demis D. John]] 19:44, 4 February 2025 (UTC) |
|||
===== |
=====ICP #2 Maint: Complete===== |
||
PECVD2 will be going down on Monday 12-11-23 at 10:00am for replacement of the RF connector and RF Electrode. |
|||
The maintenance is completed and the tool is finishing up an O2 clean run. We are still seeing a 0.04-0.05 Pa actual pressure difference in the software (as before the maint work) which we will address tomorrow, as the tool needs time to reach base pressure. -- Lee Sawyer |
|||
When the work is complete, the process group will be running tests for the remainder of the afternoon. |
|||
//[[User: |
//[[User:John_d|Demis D. John]] 02:01, 5 February 2025 (UTC) |
||
⚫ | |||
We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm. |
|||
The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd. |
|||
=====Oxford ALD+Ion Mill: UP===== |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:39, 16 November 2023 (PST) |
|||
The tool is useable and in its original condition. If you had a reservation under the previous tool designation it has already been moved over for you. |
|||
Chamber 1 is operational and available for use. However, only recipes that run at 300C are to be ran on the tool, as the current thermocouple is only calibrated for that temperature at this time. |
|||
=====Job Opening: Process Engineer===== |
|||
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
|||
Please use the original tool name on SUM to make all future tool reservations. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT) |
|||
There is no longer a need for supplemental training. If you have been previously trained on the tool but not received the supplemental training, you can once again reserve and use the tool. |
|||
=====Lab Access Changes: Symmetry App===== |
|||
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
|||
Please feel free to email me directly with any questions you may have. |
|||
// [[User:John d|John d]] 13:49, 7 November 2023 (PST) |
|||
Thanks |
|||
=====Wafer Bonder, (Suss SB6-8E)===== |
|||
Bill Millerski |
|||
SUSS now aims to be on site in early February. I’ll will send out an email once I get confirmation for a specific date. |
|||
UCSB |
|||
⚫ | |||
//[[User:John_d|Demis D. John]] 19:48, 4 February 2025 (UTC) |
|||
=====New Gowns: Toolbelts purchases===== |
|||
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase. |
|||
Two vendors for cleanroom belts we are using are listed here, you may request others: |
|||
* [https://www.terrauniversal.com/tool-belt-pocket-49in-waist-white-altessa-grid-uniform-technology-4954-60a.html Uniform Technology Tool Belt] - note the waist size, the 49” belt fits up to ~36-38” waist. |
|||
* [https://www.fishersci.com/shop/products/cleanroom-fannypack-1-ea-white/NC0723118?searchHijack=true&searchTerm=cleanroom-fannypack-1-ea-white&searchType=Rapid&matchedCatNo=NC0723118 HiTEC Fannypack] |
|||
// [[User:John_d|Demis D. John]] 03:34, 3 January 2025 (UTC) |
|||
⚫ | |||
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests. |
|||
I will send out an update once we have one. |
|||
-Aidan |
|||
⚫ | |||
=====ICP1 Down===== |
|||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
⚫ | |||
<!-- |
<!-- |
Latest revision as of 22:23, 10 February 2025
Lab is OPEN
We completed our work early and the lab is now open for use. -- Tony
//Demis D. John 22:23, 10 February 2025 (UTC)
Olympus DSX Microscope: Down
After speaking with Olympus it looks like there is a problem with the polarizer that is interfering with basic system initialization. I'm waiting for the repair quote and will update everyone when we know more. -- Tony Bosch // Demis D. John 20:41, 5 February 2025 (UTC)
Stepper #3 (ASML DUV) - Maint moved to March 3rd
We have postponed the Periodic Maintenance (PM) to the week of Monday March 3rd. Please plan your work accordingly. // Demis D. John 19:44, 4 February 2025 (UTC)
ICP #2 Maint: Complete
The maintenance is completed and the tool is finishing up an O2 clean run. We are still seeing a 0.04-0.05 Pa actual pressure difference in the software (as before the maint work) which we will address tomorrow, as the tool needs time to reach base pressure. -- Lee Sawyer
//Demis D. John 02:01, 5 February 2025 (UTC)
Oxford ALD+Ion Mill: UP
The tool is useable and in its original condition. If you had a reservation under the previous tool designation it has already been moved over for you.
Chamber 1 is operational and available for use. However, only recipes that run at 300C are to be ran on the tool, as the current thermocouple is only calibrated for that temperature at this time.
Please use the original tool name on SUM to make all future tool reservations.
There is no longer a need for supplemental training. If you have been previously trained on the tool but not received the supplemental training, you can once again reserve and use the tool.
Please feel free to email me directly with any questions you may have.
Thanks Bill Millerski UCSB //Demis D. John 19:48, 4 February 2025 (UTC)
New Gowns: Toolbelts purchases
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase.
Two vendors for cleanroom belts we are using are listed here, you may request others:
- Uniform Technology Tool Belt - note the waist size, the 49” belt fits up to ~36-38” waist.
- HiTEC Fannypack
// Demis D. John 03:34, 3 January 2025 (UTC)
Suss SB6-8E
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests.
I will send out an update once we have one. -Aidan // Demis D. John 00:35, 8 December 2024 (UTC)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)