=====Stepper #1 (GCA 6300) - Scheduled Maintenance===== |
|||
The tool will be undergoing maintenance and be unavailable the following dates and times: |
|||
| ⚫ | |||
1-18-24 at 8:00am to 1-18-24 at 6:00pm |
|||
Users, |
|||
To perform annual maintenance, we are planning to have the lab shut down from '''''9 am on Monday December 22 through 9 am Friday December 26th'''''. |
|||
Please plan |
Please plan accordingly. |
||
- Peder Lenvik |
|||
| ⚫ | |||
=====Announcements moved===== |
|||
Bill Millerski |
|||
Please check the announcements in SignupMonkey for equipment notifications. |
|||
//[[User: |
// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC) |
||
===== Stepper #2 (GCA Autostep 200) - Scheduled Maintenance===== |
|||
The tool will be undergoing maintenance and be unavailable the following dates and times: |
|||
1-15-24 at 8:00am to 1-17-24 at 6:00pm |
|||
Please plan your processing activities accordingly. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 21:49, 21 December 2023 (PST) |
|||
=====DUV is down - Update===== |
|||
contacted our vendor for an update and was told that the parts should ship by this Friday. If all goes well the tool should be up mid next week. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:07, 13 December 2023 (PST) |
|||
=====PECVD2 Planned Down Time for Maintenance 12-11-23===== |
|||
PECVD2 will be going down on Monday 12-11-23 at 10:00am for replacement of the RF connector and RF Electrode. |
|||
When the work is complete, the process group will be running tests for the remainder of the afternoon. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:07, 13 December 2023 (PST) |
|||
| ⚫ | |||
We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm. |
|||
The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:39, 16 November 2023 (PST) |
|||
=====Job Opening: Process Engineer===== |
|||
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT) |
|||
=====Lab Access Changes: Symmetry App===== |
|||
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
|||
| ⚫ | |||
=====Wafer Bonder, (Suss SB6-8E)===== |
|||
SUSS now aims to be on site in early February. I’ll will send out an email once I get confirmation for a specific date. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
|||
<!-- |
<!-- |
||
Latest revision as of 06:39, 3 December 2025
Christmas Lab Shutdown: Dec 22-25
Users, To perform annual maintenance, we are planning to have the lab shut down from 9 am on Monday December 22 through 9 am Friday December 26th.
Please plan accordingly. - Peder Lenvik // Demis D. John 02:03, 27 November 2025 (UTC)
Announcements moved
Please check the announcements in SignupMonkey for equipment notifications. // Demis D. John 02:03, 27 November 2025 (UTC)