Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
Content deleted Content added
mNo edit summary
 
(199 intermediate revisions by 4 users not shown)
Line 1: Line 1:
<startfeed />
<startfeed />
=====DSE is Up=====
We’ve run a day and a half of different recipes and haven’t seen a single issue. The standard DSE (Bosch) process has been qualified and everything is consistent with previous runs. For sensitive etches it’s recommended to do a test run to check for any process drift. Tool is free to use.
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)


=====ICP1 Down=====
=====Christmas Lab Shutdown: Dec 22-25=====
Users,
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
To perform annual maintenance, we are planning to have the lab shut down from '''''9 am on Monday December 22 through 9 am Friday December 26th'''''.
//13:47, 26 February 2024 (PST)


Please plan accordingly.
=====PlasmaTherm DSEIII is down - Update=====
- Peder Lenvik
We were able to start running recipes last night but we found the C4F8 MFC wasn’t controlling. I’ve ordered a new MFC that’s due to be on site Tuesday morning. If all goes well the tool should be up that afternoon.
//[[User:John_d|Demis D. John]] 11:18, 23 February 2024 (PST)
// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC)


=====ICP #1 is down - Update=====
=====Announcements moved=====
Please check the announcements in SignupMonkey for equipment notifications.
Some additional work is needed on the replacement board that we are waiting on. I have been informed that it will not be shipping until after the 20th (no solid date).
//[[User:John_d|Demis D. John]] 11:18, 23 February 2024 (PST)
// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC)

=====RIE 5 is up=====
RIE 5 is up except for processes that use SiCl4.
//[[User:Mehalana v|Vraj Mehalana]] 09:39, 30 January 2024 (PST)

=====EBeam3 Transfer Arm Upgrade - Postponed=====
The Transfer Arm upgrade has been postponed again, this time due to motor driver compatibility issues.

I am waiting to hear back from the manufacturer so at this time I can not reschedule yet.

I will send another notification when everything has been worked out, and I am ready to schedule the installation.
//[[User:John_d|Demis D. John]] 11:56, 13 February 2024 (PST)

=====Job Opening: Process Engineer=====
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.

//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)

=====Lab Access Changes: Symmetry App=====
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)

=====Wafer Bonder, (Suss SB6-8E)=====
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)


<!--
<!--

Latest revision as of 06:39, 3 December 2025

Christmas Lab Shutdown: Dec 22-25

Users, To perform annual maintenance, we are planning to have the lab shut down from 9 am on Monday December 22 through 9 am Friday December 26th.

Please plan accordingly. - Peder Lenvik // Demis D. John 02:03, 27 November 2025 (UTC)

Announcements moved

Please check the announcements in SignupMonkey for equipment notifications. // Demis D. John 02:03, 27 November 2025 (UTC)