Template:Announcements: Difference between revisions
Jump to navigation
Jump to search
Content deleted Content added
Mehalana v (talk | contribs) No edit summary |
mNo edit summary |
||
| (179 intermediate revisions by 3 users not shown) | |||
| Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
=====MA6 TSA is down - Update===== |
|||
Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something. |
|||
=====Christmas Lab Shutdown: Dec 22-25===== |
|||
//[[User:Mehalana v|Vraj Mehalana]] 11:15, 1 May 2024 (PDT) |
|||
Users, |
|||
=====Velion FIB Tool DOWN===== |
|||
To perform annual maintenance, we are planning to have the lab shut down from '''''9 am on Monday December 22 through 9 am Friday December 26th'''''. |
|||
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice. |
|||
Please plan accordingly. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT) |
|||
- Peder Lenvik |
|||
| ⚫ | |||
=====Announcements moved===== |
|||
=====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10===== |
|||
Please check the announcements in SignupMonkey for equipment notifications. |
|||
We are postponing the Maintenance date to May 6th – 10th. |
|||
// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC) |
|||
On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 09:42, 5 April 2024 (PDT) |
|||
=====ICP1 Down===== |
|||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
|||
=====Lab Access Changes: Symmetry App===== |
|||
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
|||
| ⚫ | |||
=====Wafer Bonder, (Suss SB6-8E)===== |
|||
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
|||
<!-- |
<!-- |
||
Latest revision as of 06:39, 3 December 2025
Christmas Lab Shutdown: Dec 22-25
Users, To perform annual maintenance, we are planning to have the lab shut down from 9 am on Monday December 22 through 9 am Friday December 26th.
Please plan accordingly. - Peder Lenvik // Demis D. John 02:03, 27 November 2025 (UTC)
Announcements moved
Please check the announcements in SignupMonkey for equipment notifications. // Demis D. John 02:03, 27 November 2025 (UTC)