Difference between revisions of "Template:Announcements"
Jump to navigation
Jump to search
Mehalana v (talk | contribs) |
Mehalana v (talk | contribs) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
− | =====EBeam4 Update - Still down===== |
||
− | EBeam4 will remain down overnight. |
||
− | |||
− | The new motor arrived as well as the new junction box and new cables. |
||
− | |||
− | I removed the old junction box/plugs due to a lot of corrosion inside the box caused by it being located directly under the water supply lines. |
||
− | |||
− | This corrosion inside the box could have contributed to the failure of the old motor. |
||
− | |||
− | I installed the new motor, ran all new cables to the new junction box in it's new location away from the water lines. |
||
− | |||
− | I was able to test the function of the hoist by raising and lowering the bell jar while in manual mode. |
||
− | |||
− | For safety reasons, I had the machine powered off during the duration of the work being done, so the cryo will be in regen overnight. |
||
− | |||
− | Tomorrow morning I will continue testing the system to ensure everything is working properly before I release the tool. |
||
− | |||
− | I will send another email when an update is available. |
||
− | |||
− | //10:36, 30 May 2024 (PDT) |
||
− | |||
− | =====Stepper #3 (ASML DUV) - System UP and calibrated===== |
||
− | We have finished calibrations, |
||
− | System is up. |
||
− | |||
− | Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose. |
||
− | |||
− | //[[User:Mehalana v|Vraj Mehalana]] 11:17, 24 May 2024 (PDT) |
||
− | |||
− | =====Atomic Force Microscope (Dimension ICON) - 05/17: System UP===== |
||
− | Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder! |
||
− | |||
− | //[[User:Mehalana v|Vraj Mehalana]] 13:46, 20 May 2024 (PDT) |
||
− | |||
− | =====MA6 TSA is down - Update===== |
||
− | We have received the replacement motor for the TSA Y axis. The FSE will be onsite Monday June 3rd to work on the tool. |
||
− | |||
− | The tool remains up for backside alignment and topside exposures that do not require alignment. |
||
− | |||
− | -Lee |
||
− | //15:59, 22 May 2024 (PDT) |
||
=====Velion FIB Tool DOWN===== |
=====Velion FIB Tool DOWN===== |
||
Line 58: | Line 17: | ||
-Mobile phone via Symmetry App |
-Mobile phone via Symmetry App |
||
− | // |
+ | //[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
=====Wafer Bonder, (Suss SB6-8E)===== |
=====Wafer Bonder, (Suss SB6-8E)===== |
Latest revision as of 15:07, 27 June 2024
Velion FIB Tool DOWN
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
//Vraj Mehalana 10:58, 30 April 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)