− | =====MLA Maintenance 6/24-6/27===== |
||
− | The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the |
||
− | evenings. |
||
− | -Lee |
||
− | //15:59, 4 June 2024 (PDT) |
||
− | |||
− | =====EBeam4 is up===== |
||
− | EBeam4 is back up. |
||
− | |||
− | The overnight regen of the cryo was completed this morning. |
||
− | I then tested the operation of the hoist numerous times without issue. |
||
− | I tested the EBeam by running 200A of Ti without issue. |
||
− | |||
− | System UP |
||
− | |||
− | //10:36, 30 May 2024 (PDT) |
||
− | |||
− | =====Stepper #1 (GCA 6300) - Tool availability===== |
||
− | Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times: |
||
− | |||
− | 6-18-24 at 8:00am |
||
− | Till |
||
− | 6-20-24 at 5:00pm |
||
− | |||
− | Please plan your processing activities accordingly. |
||
− | //13:32, 1 June 2024 (PDT) |
||
− | |||
− | =====Stepper #2 (GCA Autostep 200) - Tool availability===== |
||
− | Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times: |
||
− | |||
− | 6-21-24 at 8:00am |
||
− | Till |
||
− | 6-21-24 at 5:00pm |
||
− | |||
− | Please plan your processing activities accordingly. |
||
− | |||
− | Thanks |
||
− | Bill Millerski |
||
− | UCSB |
||
− | //13:32, 1 June 2024 (PDT) |
||
− | |||
− | =====Stepper #3 (ASML DUV) - System UP and calibrated===== |
||
− | We have finished calibrations, |
||
− | System is up. |
||
− | |||
− | Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose. |
||
− | //[[User:Mehalana v|Vraj Mehalana]] 11:17, 24 May 2024 (PDT) |
||
− | |||
− | =====Unaxis VLR still Down===== |
||
− | |||
− | The chiller has a decent sized ball of ice inside of it. |
||
− | |||
− | I need to let that melt off before I can do a proper diagnosis of what is causing the high pressure cut off to trip when the refrigerant pressures seem normal. |
||
− | //13:29, 1 June 2024 (PDT) |
||
− | |||
− | //[[User:Mehalana v|Vraj Mehalana]] 11:17, 24 May 2024 (PDT) |
||
− | |||
− | =====Atomic Force Microscope (Dimension ICON) - 05/17: System UP===== |
||
− | Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder! |
||
− | |||
− | //[[User:Mehalana v|Vraj Mehalana]] 13:46, 20 May 2024 (PDT) |
||
− | |||
− | =====MA6 TSA is down - Update===== |
||
− | Due to unforeseen circumstances our FSE will not be onsite next week to work on the TSA microscope. They have rescheduled with us for Thursday of the following week, 6/13. I apologize for the inconvenience. |
||
− | |||
− | Per my previous email, there is a MA6 available for use at CNSI. Here is a link to the webpage for their tools: |
||
− | |||
− | https://www.cnsi.ucsb.edu/facilities/quantum-structures/nanofabrication |
||
− | |||
− | -Lee |
||
− | //15:59, 22 May 2024 (PDT) |
||
=====Velion FIB Tool DOWN===== |
=====Velion FIB Tool DOWN===== |
||
Line 88: | Line 17: | ||
-Mobile phone via Symmetry App |
-Mobile phone via Symmetry App |
||
− | // |
+ | //[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
=====Wafer Bonder, (Suss SB6-8E)===== |
=====Wafer Bonder, (Suss SB6-8E)===== |
Latest revision as of 15:07, 27 June 2024
Velion FIB Tool DOWN
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
//Vraj Mehalana 10:58, 30 April 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)