=====MLA Maintenance 6/24-6/27=====
The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the
evenings.
-Lee
//15:59, 4 June 2024 (PDT)


=====EBeam4 is up=====
=====Christmas Lab Shutdown: Dec 22-25=====
Users,
EBeam4 is back up.
To perform annual maintenance, we are planning to have the lab shut down from '''''9 am on Monday December 22 through 9 am Friday December 26th'''''.


Please plan accordingly.
The overnight regen of the cryo was completed this morning.
- Peder Lenvik
I then tested the operation of the hoist numerous times without issue.
// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC)
I tested the EBeam by running 200A of Ti without issue.


=====Announcements moved=====
System UP
Please check the announcements in SignupMonkey for equipment notifications.

// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC)
//10:36, 30 May 2024 (PDT)

=====Stepper #1 (GCA 6300) - Tool availability=====
Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times:

6-18-24 at 8:00am
Till
6-20-24 at 5:00pm

Please plan your processing activities accordingly.
//13:32, 1 June 2024 (PDT)

=====Stepper #2 (GCA Autostep 200) - Tool availability=====
Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times:

6-21-24 at 8:00am
Till
6-21-24 at 5:00pm

Please plan your processing activities accordingly.

Thanks
Bill Millerski
UCSB
//13:32, 1 June 2024 (PDT)

=====Stepper #3 (ASML DUV) - System UP and calibrated=====
We have finished calibrations,
System is up.

Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose.
//[[User:Mehalana v|Vraj Mehalana]] 11:17, 24 May 2024 (PDT)

=====Unaxis VLR still Down=====

The chiller has a decent sized ball of ice inside of it.

I need to let that melt off before I can do a proper diagnosis of what is causing the high pressure cut off to trip when the refrigerant pressures seem normal.
//13:29, 1 June 2024 (PDT)

//[[User:Mehalana v|Vraj Mehalana]] 11:17, 24 May 2024 (PDT)

=====Atomic Force Microscope (Dimension ICON) - 05/17: System UP=====
Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!

//[[User:Mehalana v|Vraj Mehalana]] 13:46, 20 May 2024 (PDT)

=====MA6 TSA is down - Update=====
Due to unforeseen circumstances our FSE will not be onsite next week to work on the TSA microscope. They have rescheduled with us for Thursday of the following week, 6/13. I apologize for the inconvenience.

Per my previous email, there is a MA6 available for use at CNSI. Here is a link to the webpage for their tools:

https://www.cnsi.ucsb.edu/facilities/quantum-structures/nanofabrication

-Lee
//15:59, 22 May 2024 (PDT)

=====Velion FIB Tool DOWN=====
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)

=====ICP1 Down=====
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)

=====Lab Access Changes: Symmetry App=====
The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//10:54, 23 May 2024 (PDT)

=====Wafer Bonder, (Suss SB6-8E)=====
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)


<!--
<!--

Latest revision as of 06:39, 3 December 2025

Christmas Lab Shutdown: Dec 22-25

Users, To perform annual maintenance, we are planning to have the lab shut down from 9 am on Monday December 22 through 9 am Friday December 26th.

Please plan accordingly. - Peder Lenvik // Demis D. John 02:03, 27 November 2025 (UTC)

Announcements moved

Please check the announcements in SignupMonkey for equipment notifications. // Demis D. John 02:03, 27 November 2025 (UTC)