=====Unaxis ICP-PECVD Update=====
It took me a while to weed through the issues as nothing was making sense. What I have found is all of our spare matching networks of this particular type are bad. I will be sending them out for repair and update you all when I have an eta to get the system back online.


===== EVG is down - Update=====
-Tony
I checked in with our vendor today as it has been 2 weeks since they got started on our RF generator. They are waiting on a part for it that should be arriving on Monday. If all goes well we should have the unit back late next week. I'll check with the vendor again on Wednesday and send out another update.
//[[User:Mehalana v|Vraj Mehalana]] 12:07, 15 July 2024 (PDT)
=====Dicing Saw Service Visit=====
The annual PM on the tool has been completed. However, there is still the issue with the chuck not rotating a perfect 90 degrees after aligning the first angle, so you will still have to perform alignment for angle #2. ADT is looking into sending us a cal plate to try and rectify this as the first potential solution.


-Lee
-Lee
//[[User:Mehalana v|Vraj Mehalana]] 16:48, 17 October 2024 (UTC)


===== E- Beam #2 Maint Work Next Week=====
//[[User:Mehalana v|Vraj Mehalana]] 10:23, 8 July 2024 (PDT)
E-Beam #2 will be down next Wednesday (10/16) and possibly into Thursday to replace the hoist sensors. This will also reduce the likelihood of future issues with the hoist which we dealt with recently. I will send an email out once the work is completed.


-Lee
=====Velion FIB Tool DOWN=====
//[[User:Mehalana v|Vraj Mehalana]] 13:23, 10 October 2024 (PDT)
Raith service have completed the source change, resolved the power supply and column alignment issues, and restored the Pt deposition capability to full capacity. With remote assistance from Raith I will run some calibrations and stability tests over the next few days. After that I will return the tool to general use towards the end of the week.


=====Stepper #3 (ASML DUV) - Tool UP=====
The new ion source is AuGeSi. We have no plans to return to GaBiLi for the foreseeable future. Please get in contact if you have any questions.
We finished calibrations, tool is up and ready for use.
No limit on number of wafers.


Input has been set back to port # 1 (right) cassette, outputting to Left cassette (Port #2). // [[User:John_d|Demis D. John]] 17:36, 9 October 2024 (PDT)
-Dan


=====Suss SB6-8E=====
//[[User:Mehalana v|Vraj Mehalana]] 10:23, 8 July 2024 (PDT)
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.

-Aidan
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT)


=====ICP1 Down=====
=====ICP1 Down=====
Line 33: Line 37:


//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)

=====Wafer Bonder, (Suss SB6-8E)=====
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)


<!--
<!--

Latest revision as of 16:48, 17 October 2024

EVG is down - Update

I checked in with our vendor today as it has been 2 weeks since they got started on our RF generator. They are waiting on a part for it that should be arriving on Monday. If all goes well we should have the unit back late next week. I'll check with the vendor again on Wednesday and send out another update.

-Lee //Vraj Mehalana 16:48, 17 October 2024 (UTC)

E- Beam #2 Maint Work Next Week

E-Beam #2 will be down next Wednesday (10/16) and possibly into Thursday to replace the hoist sensors. This will also reduce the likelihood of future issues with the hoist which we dealt with recently. I will send an email out once the work is completed.

-Lee //Vraj Mehalana 13:23, 10 October 2024 (PDT)

Stepper #3 (ASML DUV) - Tool UP

We finished calibrations, tool is up and ready for use. No limit on number of wafers.

Input has been set back to port # 1 (right) cassette, outputting to Left cassette (Port #2). // Demis D. John 17:36, 9 October 2024 (PDT)

Suss SB6-8E

When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.

-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)