Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
Content deleted Content added
No edit summary
mNo edit summary
 
(154 intermediate revisions by 3 users not shown)
Line 1: Line 1:
<startfeed />
<startfeed />
=====Unaxis ICP-PECVD Update=====
It took me a while to weed through the issues as nothing was making sense. What I have found is all of our spare matching networks of this particular type are bad. I will be sending them out for repair and update you all when I have an eta to get the system back online.


=====Christmas Lab Shutdown: Dec 22-25=====
-Tony
Users,
//[[User:Mehalana v|Vraj Mehalana]] 12:07, 15 July 2024 (PDT)
To perform annual maintenance, we are planning to have the lab shut down from '''''9 am on Monday December 22 through 9 am Friday December 26th'''''.
=====Dicing Saw Service Visit=====
The annual PM on the tool has been completed. However, there is still the issue with the chuck not rotating a perfect 90 degrees after aligning the first angle, so you will still have to perform alignment for angle #2. ADT is looking into sending us a cal plate to try and rectify this as the first potential solution.


Please plan accordingly.
-Lee
- Peder Lenvik
// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC)


=====Announcements moved=====
//[[User:Mehalana v|Vraj Mehalana]] 10:23, 8 July 2024 (PDT)
Please check the announcements in SignupMonkey for equipment notifications.

// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC)
=====Velion FIB Tool DOWN=====
Raith service have completed the source change, resolved the power supply and column alignment issues, and restored the Pt deposition capability to full capacity. With remote assistance from Raith I will run some calibrations and stability tests over the next few days. After that I will return the tool to general use towards the end of the week.

The new ion source is AuGeSi. We have no plans to return to GaBiLi for the foreseeable future. Please get in contact if you have any questions.

-Dan

//[[User:Mehalana v|Vraj Mehalana]] 10:23, 8 July 2024 (PDT)

=====ICP1 Down=====
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)

=====Lab Access Changes: Symmetry App=====
The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)

=====Wafer Bonder, (Suss SB6-8E)=====
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)


<!--
<!--

Latest revision as of 06:39, 3 December 2025

Christmas Lab Shutdown: Dec 22-25

Users, To perform annual maintenance, we are planning to have the lab shut down from 9 am on Monday December 22 through 9 am Friday December 26th.

Please plan accordingly. - Peder Lenvik // Demis D. John 02:03, 27 November 2025 (UTC)

Announcements moved

Please check the announcements in SignupMonkey for equipment notifications. // Demis D. John 02:03, 27 November 2025 (UTC)