=====Unaxis ICP-PECVD Update===== |
|||
I received word that the matching networks have been repaired and shipped back to us. As soon as I receive them I'll need 1 day to get the system running and released. |
|||
=====Christmas Lab Shutdown: Dec 22-25===== |
|||
//10:48, 25 July 2024 (PDT) |
|||
Users, |
|||
To perform annual maintenance, we are planning to have the lab shut down from '''''9 am on Monday December 22 through 9 am Friday December 26th'''''. |
|||
Please plan accordingly. |
|||
=====Dicing Saw Service Visit===== |
|||
- Peder Lenvik |
|||
The annual PM on the tool has been completed. However, there is still the issue with the chuck not rotating a perfect 90 degrees after aligning the first angle, so you will still have to perform alignment for angle #2. ADT is looking into sending us a cal plate to try and rectify this as the first potential solution. |
|||
// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC) |
|||
=====Announcements moved===== |
|||
-Lee |
|||
Please check the announcements in SignupMonkey for equipment notifications. |
|||
//[[User: |
// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC) |
||
=====Velion FIB Tool DOWN===== |
|||
Raith service have completed the source change, resolved the power supply and column alignment issues, and restored the Pt deposition capability to full capacity. With remote assistance from Raith I will run some calibrations and stability tests over the next few days. After that I will return the tool to general use towards the end of the week. |
|||
The new ion source is AuGeSi. We have no plans to return to GaBiLi for the foreseeable future. Please get in contact if you have any questions. |
|||
-Dan |
|||
//[[User:Mehalana v|Vraj Mehalana]] 10:23, 8 July 2024 (PDT) |
|||
=====ICP1 Down===== |
|||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
|||
=====Lab Access Changes: Symmetry App===== |
|||
The iris scanner has been decommissioned. Please use the card reader which supports: |
|||
-Physical card |
|||
-Mobile phone via Symmetry App |
|||
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
|||
=====Wafer Bonder, (Suss SB6-8E)===== |
|||
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
|||
<!-- |
<!-- |
||
Latest revision as of 06:39, 3 December 2025
Christmas Lab Shutdown: Dec 22-25
Users, To perform annual maintenance, we are planning to have the lab shut down from 9 am on Monday December 22 through 9 am Friday December 26th.
Please plan accordingly. - Peder Lenvik // Demis D. John 02:03, 27 November 2025 (UTC)
Announcements moved
Please check the announcements in SignupMonkey for equipment notifications. // Demis D. John 02:03, 27 November 2025 (UTC)