=====IBD is UP=====
=====Oxford Flexal ALD=====
The PM is proceeding slower than expected. As such, I currently anticipate that the tool will be available for use by the end of the day on Friday.
Replaced bad PLC controller on Depo beam. I then tested the beam with a 15 min gridclean recipe without issue.
I then ran an SiO2 dep, and a 1 hour gridclean without issue.


Sorry for any inconvenience this may cause.
System UP - Mike Barreraz
// [[User:John_d|Demis D. John]] 14:18, 12 September 2024 (PDT)


Thanks
=====Focused Ion Beam (Raith Velion) - TOOL DOWN for Raith Service=====
Bill Millerski
Raith service need to work on the Velion a little longer than anticipated. I'll keep the tool down until 2pm tomorrow (Tuesday). I'll send further updates if anything changes.
//[[User:Mehalana v|Vraj Mehalana]] 21:12, 12 August 2025 (UTC)

-Dan
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 12 September 2024 (PDT)

=====Lab Closure Monday the 16th=====
Fire Drill completed. Lab open.
// [[User:Mehalana v|Vraj Mehalana]] 10:57, 12 September 2024 (PDT)

=====MLA150: UP=====
Optical AF has been calibrated and Defocus + Dose values are the same as before. PneuAF has not been checked et, but we expect a shift in PneuAF Defocus due to the Pneumatic nozzle replacement.
// [[User:John_d|Demis D. John]] 18:14, 11 September 2024 (PDT)

=====Stepper #3 (ASML DUV) - Down, update=====
The alignment laser has now fully failed (no laser output at all), so we can't perform any exposures.
ASML engineers will be on site Monday Tues (Sept 16th) to perform the repair.
// [[User:John_d|Demis D. John]] 18:14, 11 September 2024 (PDT)


=====Suss SB6-8E=====
=====Suss SB6-8E=====
This tool is down indefinitely. We are sourcing manual bonding fixtures, and already have a 1cm bonding fixture for NanoFab users to use - please contact [[Demis D. John]] for more information.
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
// [[User:John_d|Demis D. John]] 04:28, 5 August 2025 (UTC)

-Aidan
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT)

=====EBeam#2: Up=====
Bell jar mount is in place. Hoist has been tested several times. System is ready to use.
// [[User:John_d|Demis D. John]] 18:14, 11 September 2024 (PDT)

=====YES EcoClean UP=====
The YES has been giving downstream temp warnings for the RF generator. These happen on the 3000W recipes that run for more than 4-5 minutes, and are just warnings (yellow banner/light), and can just be acknowledged without notifying Staff. Our other generator is out for repair, so this will be the norm until we get it back. Please let us know if you do get an error for this; red banner/light.
// [[User:John_d|Demis D. John]] 18:14, 11 September 2024 (PDT)


=====ICP1 Down=====
=====ICP1 Down=====
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)

=====Lab Access Changes: Symmetry App=====
The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)


<!--
<!--

Latest revision as of 22:24, 13 August 2025

Oxford Flexal ALD

The PM is proceeding slower than expected. As such, I currently anticipate that the tool will be available for use by the end of the day on Friday.

Sorry for any inconvenience this may cause.

Thanks Bill Millerski //Vraj Mehalana 21:12, 12 August 2025 (UTC)

Suss SB6-8E

This tool is down indefinitely. We are sourcing manual bonding fixtures, and already have a 1cm bonding fixture for NanoFab users to use - please contact Demis D. John for more information. // Demis D. John 04:28, 5 August 2025 (UTC)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)