=====Oxford Flexal ALD===== |
|||
The PM is proceeding slower than expected. As such, I currently anticipate that the tool will be available for use by the end of the day on Friday. |
|||
Sorry for any inconvenience this may cause. |
|||
=====Stepper #3 (ASML DUV) - Tool down===== |
|||
Wafer stage positioning laser is dying, Asml engineers will be on site Monday and Tuesday to repair. We have the replacement already on hand. |
|||
Thanks |
|||
Unfortunately, we cannot initialize the stage at this time. System is down. // [[User:Mehalana v|Vraj Mehalana]] 18:36, 3 October 2024 (PDT) |
|||
Bill Millerski |
|||
⚫ | |||
=====MLA Service Complete===== |
|||
The FSE has completed their work. |
|||
I ran beam offset checks on both lasers prior to the maintenance and found that the Y axis value for the 405 laser was off by ~0.6 µm. I made the necessary change and ran another check with all values in spec. I also ran beam offset checks on both laser post maintenance along with an overlay exposure and all looked good. |
|||
Tool is available to use. |
|||
⚫ | |||
=====Suss SB6-8E===== |
=====Suss SB6-8E===== |
||
This tool is down indefinitely. We are sourcing manual bonding fixtures, and already have a 1cm bonding fixture for NanoFab users to use - please contact [[Demis D. John]] for more information. |
|||
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed. |
|||
⚫ | |||
-Aidan |
|||
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT) |
|||
=====ICP1 Down===== |
=====ICP1 Down===== |
||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
||
=====Lab Access Changes: Symmetry App===== |
|||
The iris scanner has been decommissioned. Please use the card reader which supports: |
|||
-Physical card |
|||
-Mobile phone via Symmetry App |
|||
⚫ | |||
<!-- |
<!-- |
Latest revision as of 22:24, 13 August 2025
Oxford Flexal ALD
The PM is proceeding slower than expected. As such, I currently anticipate that the tool will be available for use by the end of the day on Friday.
Sorry for any inconvenience this may cause.
Thanks Bill Millerski //Vraj Mehalana 21:12, 12 August 2025 (UTC)
Suss SB6-8E
This tool is down indefinitely. We are sourcing manual bonding fixtures, and already have a 1cm bonding fixture for NanoFab users to use - please contact Demis D. John for more information. // Demis D. John 04:28, 5 August 2025 (UTC)
ICP1 Down