<startfeed /> |
<startfeed /> |
||
⚫ | |||
The PM is proceeding slower than expected. As such, I currently anticipate that the tool will be available for use by the end of the day on Friday. |
|||
Sorry for any inconvenience this may cause. |
|||
=====YES - Scheduled Maint===== |
|||
I will be taking the YES down for a PM on Tuesday beginning at 8 am. Since I will be changing out the throttle valve and swapping in our original generator, this could go into Wednesday. Please plan your processing accordingly. |
|||
-Lee |
|||
⚫ | |||
=====Lab is Open===== |
|||
All suits have been pulled and new suits have been put up. All personal items left behind can be found in the boxes in the lobby. |
|||
Please sign up for your hanger spot. |
|||
THE LAB IS NOW OPEN FOR BUSINESS |
|||
Thank you for your patience during shutdown activities. |
|||
-- [[Peder Lenvik]] |
|||
// [[User:John_d|Demis D. John]] 03:34, 3 January 2025 (UTC) |
|||
=====New Gowns in Jan===== |
|||
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. |
|||
Two vendors for cleanroom belts we are using, you may request others: |
|||
* [https://www.terrauniversal.com/tool-belt-pocket-49in-waist-white-altessa-grid-uniform-technology-4954-60a.html Uniform Technology Tool Belt] - note the waist size, the 49” belt fits up to ~36-38” waist. |
|||
* [https://www.fishersci.com/shop/products/cleanroom-fannypack-1-ea-white/NC0723118?searchHijack=true&searchTerm=cleanroom-fannypack-1-ea-white&searchType=Rapid&matchedCatNo=NC0723118 HiTEC Fannypack] |
|||
// [[User:John_d|Demis D. John]] 03:34, 3 January 2025 (UTC) |
|||
=====KLA P7 Profilometer: Down===== |
|||
The KLA remains down awaiting parts. This part order has been expedited to the extent possible and should be here in the next few days. |
|||
Thanks |
Thanks |
||
Bill Millerski |
Bill Millerski |
||
// |
//[[User:Mehalana v|Vraj Mehalana]] 21:12, 12 August 2025 (UTC) |
||
⚫ | |||
Unfortunately Chamber 1 is still down for our Oxford Cluster tool. However we did manage a "work around" to get Chamber 2 and Chamber 3 operational again. The software is in constant error state which does not affect processing on Chamber 2 and Chamber 3. |
|||
A new tool listing is available in sign up monkey for both these chambers with the word "temporary" or "temp". For the time being users will have to use these "new" tool listings to reserve time on Chamber 2 and Chamber 3. Users will have to go through a quick tutorial with me prior to having access to the tool in order to reserve time slots on sign up monkey. Under NO circumstances are users to use this tool prior to being signed off after being shown how to navigate the software under the current error state. |
|||
Just to reiterate: |
|||
1) The tool remains locked out in sign up monkey for the previous tool names |
|||
2) There is a new tool designation for Chamber 2 & 3 in sign up monkey"Deposition, ALD, Chamber 3 (Oxford FlexAl) Temporary""Dry Etch, Ion Mill (Oxford Flexal) Temp" |
|||
3) Users need a quick tutorial from me prior to getting tool access. |
|||
4) Users are not to run the tool until being signed off on the new procedure by staff! Any user caught using the tool without having the updated tool tutorial sign off, will be subject to suspension. |
|||
5) I will be available at any time during my regular scheduled shift to sign users off. I will be at the tool in the lab for the majority of my work day. |
|||
-- Bill Millerski |
|||
//[[User:Mehalana v|Vraj Mehalana]] 23:40, 8 January 2025 (UTC) |
|||
=====Holography/PL: HeCd Laser Down Mon Dec 16th===== |
|||
The 325nm UV Laser will be unavailable from Mon. Dec 16th, through the christmas shutdown, and will be available again soon after Monday Jan 6th. |
|||
We will be installing the refurbished laser which will have higher output power. |
|||
Holography will be unavailable during this time, but all other PL lasers will be available. |
|||
// [[User:John_d|Demis D. John]] 03:28, 3 January 2025 (UTC) |
|||
=====Suss SB6-8E===== |
=====Suss SB6-8E===== |
||
This tool is down indefinitely. We are sourcing manual bonding fixtures, and already have a 1cm bonding fixture for NanoFab users to use - please contact [[Demis D. John]] for more information. |
|||
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests. |
|||
⚫ | |||
I will send out an update once we have one. |
|||
-Aidan |
|||
// [[User:John_d|Demis D. John]] 00:35, 8 December 2024 (UTC) |
|||
=====ICP1 Down===== |
=====ICP1 Down===== |
Latest revision as of 22:24, 13 August 2025
Oxford Flexal ALD
The PM is proceeding slower than expected. As such, I currently anticipate that the tool will be available for use by the end of the day on Friday.
Sorry for any inconvenience this may cause.
Thanks Bill Millerski //Vraj Mehalana 21:12, 12 August 2025 (UTC)
Suss SB6-8E
This tool is down indefinitely. We are sourcing manual bonding fixtures, and already have a 1cm bonding fixture for NanoFab users to use - please contact Demis D. John for more information. // Demis D. John 04:28, 5 August 2025 (UTC)
ICP1 Down