Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
No edit summary
(water outage chemical processing)
 
(61 intermediate revisions by 3 users not shown)
Line 1: Line 1:
<startfeed />
<startfeed />
===== Chemical processing is UP =====
There was a short ~30min campus water outage, but it has now been restored.
Chemical usage/processing is now allowed as normal.
// [[User:John_d|Demis D. John]] 18:36, 16 June 2025 (UTC)


=====ICP #2 Scheduled Maint next Tuesday 2/4=====
===== Raith EBL Update =====
Unfortunately the fix discussed in the last update turned out to be a good news/bad news thing. The good news is that the majority of the field distortion problem we have experienced since the install has been addressed. However the bad news is that there is still a residual settling effect that is distorting the field in one part of the field only and prevents the tool from fully meeting specifications. So it turned out to a layers of an onion kind of thing – because of course it did.


So the suspect now is the fine focus coil in the column (one of the factory engineers predicted stitch shifts when a faulty fine focus coil is present which essentially replicated the errors we are now seeing) and the question now is how to get one of these sent to UCSB. They are a factory install item so for us to get one, and one that has been tested and confirmed to be fully operational, would require it to be taken from a tool currently under fabrication on the production line.
ICP#2 will be unavailable a good chunk of the day this coming Tuesday. We will be cleaning the chamber and servicing the throttle valve as we believe it may be the source of the reaction chamber pressure errors (plus it is due for servicing).


We are close, very close, but still not quite there. And I am really sorry that is still the case…
-Lee
-Bill
// [[User:John_d|Demis D. John]] 22:53, 13 June 2025 (UTC)


===== SignupMonkey + Wiki: Off-Campus Access=====
//[[User:Mehalana v|Vraj Mehalana]] 18:54, 31 January 2025 (UTC)
Due to a DDoS attack affecting the Signupmonkey server, we have restricted access to the website to US locations only, including both the Nanofab Wiki and Signupmonkey.
=====YES - Scheduled Maint=====


If you are off-campus and experiencing issues, please utilize the UCSB VPN to access our sites. Here are the installation instructions for VPN on your device. You will need your UCSB NetID for download and installation - you would have received a UCSB NetID when you started using the NanoFab:
I will be taking the YES down for a PM on Tuesday beginning at 8 am. Since I will be changing out the throttle valve and swapping in our original generator, this could go into Wednesday. Please plan your processing accordingly.


https://it.ucsb.edu/ivanti-secure-access-campus-vpn/get-connected-campus-vpn
-Lee


-- Vraj
//[[User:Mehalana v|Vraj Mehalana]] 17:22, 23 January 2025 (UTC)
// [[User:John_d|Demis D. John]] 20:08, 22 April 2025 (UTC)

=====Lab is Open=====

All suits have been pulled and new suits have been put up. All personal items left behind can be found in the boxes in the lobby.

Please sign up for your hanger spot.

THE LAB IS NOW OPEN FOR BUSINESS

Thank you for your patience during shutdown activities.
-- [[Peder Lenvik]]

// [[User:John_d|Demis D. John]] 03:34, 3 January 2025 (UTC)

=====New Gowns in Jan=====
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use.

Two vendors for cleanroom belts we are using, you may request others:
* [https://www.terrauniversal.com/tool-belt-pocket-49in-waist-white-altessa-grid-uniform-technology-4954-60a.html Uniform Technology Tool Belt] - note the waist size, the 49” belt fits up to ~36-38” waist.
* [https://www.fishersci.com/shop/products/cleanroom-fannypack-1-ea-white/NC0723118?searchHijack=true&searchTerm=cleanroom-fannypack-1-ea-white&searchType=Rapid&matchedCatNo=NC0723118 HiTEC Fannypack]

// [[User:John_d|Demis D. John]] 03:34, 3 January 2025 (UTC)

=====KLA P7 Profilometer: Down=====
The KLA remains down awaiting parts. This part order has been expedited to the extent possible and should be here in the next few days.

Thanks
Bill Millerski
// [[User:John_d|Demis D. John]] 03:30, 3 January 2025 (UTC)

=====Oxford ALD+Ion Mill=====
Unfortunately Chamber 1 is still down for our Oxford Cluster tool. However we did manage a "work around" to get Chamber 2 and Chamber 3 operational again. The software is in constant error state which does not affect processing on Chamber 2 and Chamber 3.
A new tool listing is available in sign up monkey for both these chambers with the word "temporary" or "temp". For the time being users will have to use these "new" tool listings to reserve time on Chamber 2 and Chamber 3. Users will have to go through a quick tutorial with me prior to having access to the tool in order to reserve time slots on sign up monkey. Under NO circumstances are users to use this tool prior to being signed off after being shown how to navigate the software under the current error state.

Just to reiterate:
1) The tool remains locked out in sign up monkey for the previous tool names

2) There is a new tool designation for Chamber 2 & 3 in sign up monkey"Deposition, ALD, Chamber 3 (Oxford FlexAl) Temporary""Dry Etch, Ion Mill (Oxford Flexal) Temp"

3) Users need a quick tutorial from me prior to getting tool access.

4) Users are not to run the tool until being signed off on the new procedure by staff! Any user caught using the tool without having the updated tool tutorial sign off, will be subject to suspension.

5) I will be available at any time during my regular scheduled shift to sign users off. I will be at the tool in the lab for the majority of my work day.
-- Bill Millerski
//[[User:Mehalana v|Vraj Mehalana]] 23:40, 8 January 2025 (UTC)

=====Holography/PL: HeCd Laser Down Mon Dec 16th=====
The 325nm UV Laser will be unavailable from Mon. Dec 16th, through the christmas shutdown, and will be available again soon after Monday Jan 6th.
We will be installing the refurbished laser which will have higher output power.

Holography will be unavailable during this time, but all other PL lasers will be available.
// [[User:John_d|Demis D. John]] 03:28, 3 January 2025 (UTC)


=====Suss SB6-8E=====
=====Suss SB6-8E=====

Latest revision as of 18:36, 16 June 2025

Chemical processing is UP

There was a short ~30min campus water outage, but it has now been restored. Chemical usage/processing is now allowed as normal. // Demis D. John 18:36, 16 June 2025 (UTC)

Raith EBL Update

Unfortunately the fix discussed in the last update turned out to be a good news/bad news thing. The good news is that the majority of the field distortion problem we have experienced since the install has been addressed. However the bad news is that there is still a residual settling effect that is distorting the field in one part of the field only and prevents the tool from fully meeting specifications. So it turned out to a layers of an onion kind of thing – because of course it did.

So the suspect now is the fine focus coil in the column (one of the factory engineers predicted stitch shifts when a faulty fine focus coil is present which essentially replicated the errors we are now seeing) and the question now is how to get one of these sent to UCSB. They are a factory install item so for us to get one, and one that has been tested and confirmed to be fully operational, would require it to be taken from a tool currently under fabrication on the production line.

We are close, very close, but still not quite there. And I am really sorry that is still the case… -Bill // Demis D. John 22:53, 13 June 2025 (UTC)

SignupMonkey + Wiki: Off-Campus Access

Due to a DDoS attack affecting the Signupmonkey server, we have restricted access to the website to US locations only, including both the Nanofab Wiki and Signupmonkey.

If you are off-campus and experiencing issues, please utilize the UCSB VPN to access our sites. Here are the installation instructions for VPN on your device. You will need your UCSB NetID for download and installation - you would have received a UCSB NetID when you started using the NanoFab:

https://it.ucsb.edu/ivanti-secure-access-campus-vpn/get-connected-campus-vpn

-- Vraj // Demis D. John 20:08, 22 April 2025 (UTC)

Suss SB6-8E

We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests.

I will send out an update once we have one. -Aidan // Demis D. John 00:35, 8 December 2024 (UTC)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)